[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,12,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,189,201,213,223,235,247,259,271,280,292,304,313,325,337,349,361,373,385,397,409,421,433,444,456,468,480,492,502,514,526,538,550,562,574,586,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},388762,1,"单选题","以下关于范围变更的说法错误的是 （ ） 。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","范围变更是不可避免的，范围变更如果不加以控制可能引起范围蔓延",false,{"key":24,"text":25,"correct":22},"B","客户对产品的需求发生变化其实就是一种范围变更",{"key":27,"text":28,"correct":22},"C","范围变更过程中应多让客户参与，以免后期进行范围确认时发生问题",{"key":30,"text":31,"correct":32},"D","范围变更控制流程与整体变更控制流程应分开设计，确保项目发生范围变更时遵从范围变更控制流程，由于范围变更引起了其他变更时遵从整体变更流程",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},388763,"以下关于创建工作分解结构（WBS）的叙述中， （ ）是不准确的。",[38,40,42,44],{"key":20,"text":39,"correct":22},"当前较常用的工作分解结构表示形式主要有分级的树型结构和列表",{"key":24,"text":41,"correct":32},"WBS最底层次的工作单元是工作包，业内一般把1个人1周能干完的工作称为一个工作包",{"key":27,"text":43,"correct":22},"创建WBS的输入包括详细的项目范围说明书、项目管理计划、组织过程资产",{"key":30,"text":45,"correct":22},"创建WBS的输出包括WBS和WBS字典、范围基准、更新的项目管理计划",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},388764,"需求跟踪矩阵的作用是 （ ） 。",[50,52,54,56],{"key":20,"text":51,"correct":32},"可以体现需求与后续工作成果之间的对应关系",{"key":24,"text":53,"correct":22},"固化需求，防止变更",{"key":27,"text":55,"correct":22},"明确项目干系人对于需求的责任",{"key":30,"text":57,"correct":22},"对于需求复杂的项目，可以用来明确需求",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},388765,"某待开发的信息系统工作分解结构图如下图，其中标有“（1）”的方框应该填入的内容是 （ ） 。",[62,64,66,68],{"key":20,"text":63,"correct":22},"同行评审",{"key":24,"text":65,"correct":22},"计划评审",{"key":27,"text":67,"correct":32},"项目计划制定",{"key":30,"text":69,"correct":22},"集成方案制定",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},388766,"制定项目计划时，首先应关注的是项目（）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"范围说明书",{"key":24,"text":77,"correct":22},"工作分解结构",{"key":27,"text":79,"correct":22},"风险管理计划",{"key":30,"text":81,"correct":22},"质量计划",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},388767,"收集需求的工具和技术是（ ）",[86,88,90,92],{"key":20,"text":87,"correct":32},"问卷调查",{"key":24,"text":89,"correct":22},"专家判断",{"key":27,"text":91,"correct":22},"引导技术",{"key":30,"text":93,"correct":22},"分析技术",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},388768,"在需求分析中，面向团队的需求收集方法能够鼓励合作。以下关于面向团队的需求收集方法的叙述中， （ ） 是不恰当的。",[98,100,102,104],{"key":20,"text":99,"correct":22},"举行需求收集会议，会议由软件工程师、客户和其他利益相关者举办和参加",{"key":24,"text":101,"correct":22},"拟定会议议程，与会者围绕需求要点，畅所欲言",{"key":27,"text":103,"correct":32},"会议提倡自由发言，不需要特意控制会议的进度",{"key":30,"text":105,"correct":22},"会议目的是识别问题，提出解决方案的要点，初步描述解决方案中的需求问题",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},388769,"活动排序的工具和技术有多种，工具和技术的选取由若干因素决定。如果项目经理决定在进度计划编制中使用标准化的项目进度网络图，这可能因为 （ ）",[110,112,114,116],{"key":20,"text":111,"correct":22},"该项目非常独特，在不同的阶段需要专门的网络图",{"key":24,"text":113,"correct":22},"在现有网络上具有可以获取的资源管理软件",{"key":27,"text":115,"correct":32},"在项目中包含几个相同或几乎相同的可交付成果",{"key":30,"text":117,"correct":22},"项目中存在多条关键路径",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},388770,"下面为需求跟踪过程中的相互影响能力链的局部示意图，图中空缺部分内容①、②分别应为 （ ） 。",[122,124,126,128],{"key":20,"text":123,"correct":32},"变更请求、系统测试",{"key":24,"text":125,"correct":22},"系统需求、系统测试",{"key":27,"text":127,"correct":22},"变更请求、集成测试",{"key":30,"text":129,"correct":22},"系统需求、集成测试",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},388771,"王工是公司一个物联网网关开发项目的项目经理。他根据项目计划将其中的某个软件模块转包给了一个分包商。小李是分包商的新项目经理。王工应建议小李首先 （ ） 。",[134,136,138,140],{"key":20,"text":135,"correct":22},"遵照王工为项目制定的WBS",{"key":24,"text":137,"correct":32},"针对这个软件模块的开发工作编制一个分项目WBS",{"key":27,"text":139,"correct":22},"建立类似的编码结构，以便于应用公共项目管理信息系统",{"key":30,"text":141,"correct":22},"建立一个WBS词典来显示详细的人员分工",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":30,"analysis":33},388772,"以下关于需求跟踪的叙述中， （ ） 是不正确的。",[146,148,150,152],{"key":20,"text":147,"correct":22},"逆向需求跟踪检查设计文档、代码、测试用例等工作产品是否都能在《需求规格说明书》中找到出处",{"key":24,"text":149,"correct":22},"需求跟踪矩阵可以把每个需求与业务目标或项目目标联系起来",{"key":27,"text":151,"correct":22},"需求跟踪矩阵为管理产品范围变更提供框架",{"key":30,"text":153,"correct":32},"如果按照“需求开发—系统设计—编码—测试”这样的顺序开发产品，由于每一步的输出就是下一步的输入，所以不必担心设计、编程、测试会与需求不一致，可以省略需求跟踪",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},388773,"项目范围规划是确定项目范围并编写项目说明书的过程。针对大型、多项目，一般的做法是（ ） 。",[158,160,162,164],{"key":20,"text":159,"correct":22},"子项目制定各自的项目范围说明书，作为与任务委托者之间签订协议的基础",{"key":24,"text":161,"correct":32},"项目范围说明书要由项目组撰写，是项目组和任务委托者之间签订协议的基础",{"key":27,"text":163,"correct":22},"不必将子项目的变更纳入到项目的范围之内",{"key":30,"text":165,"correct":22},"项目范围一旦确定就不允许发生变更",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},388774,"以下关于项目范围管理的叙述中， （ ） 是不正确的。",[170,172,174,176],{"key":20,"text":171,"correct":22},"一般项目目标的设定标准可用一个单词SMART来表达",{"key":24,"text":173,"correct":32},"项目目标开始是出现在初步项目范围说明书里，后来被定义并最终归结到项目范围",{"key":27,"text":175,"correct":22},"范围定义过程给出了项目和产品的详细描述，并把结果写进详细的项目范围说明书",{"key":30,"text":177,"correct":22},"范围确认也被称为范围核实，它的目的是核实工作结果的正确与否，应该贯穿项目始终",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},388775,"（ ）不是获取需求的方法。",[182,183,185,187],{"key":20,"text":87,"correct":22},{"key":24,"text":184,"correct":22},"会议讨论",{"key":27,"text":186,"correct":22},"获取原型",{"key":30,"text":188,"correct":32},"决策分析",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},388776,"范围变更控制系统（）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"是用以确定正式修改项目文件所必须遵循步骤的正式存档程序",{"key":24,"text":196,"correct":22},"是用于在技术与管理方面监督指导有关报告内容，以及控制变更的确定与记录工作并确保其符合要求的存档程序",{"key":27,"text":198,"correct":32},"是一套用于对项目范围做出变更的程序，包括文书工作，跟踪系统以及授权变更所需的认可",{"key":30,"text":200,"correct":22},"可强制用于各项目工作以确保项目范围管理计划在未经事先审查与签字的情况下不得做出变更",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},388777,"完成某信息系统集成项目中的一个最基本的工作单元A所需的时间，乐观的估计需8天，悲观的估计需38天，最可能的估计需20天，按照PERT方法进行估算，项目的工期应该为（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"20",{"key":24,"text":208,"correct":32},"21",{"key":27,"text":210,"correct":22},"22",{"key":30,"text":212,"correct":22},"23",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":27,"analysis":33},388778,"某项目由ABCDE五个活动构成，完成各活动工作所需要的最可能时间Tm、最乐观时间To、最悲观时间Tp见下表： 各活动之间的信赖关系如下： 则该项目工期的估算结果约为 （ ） 天。",[217,218,219,221],{"key":20,"text":210,"correct":22},{"key":24,"text":212,"correct":22},{"key":27,"text":220,"correct":32},"24",{"key":30,"text":222,"correct":22},"25",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":27,"analysis":33},388779,"进度风险导致的损失不包括（ ） 。",[227,229,231,233],{"key":20,"text":228,"correct":22},"货币的时间价值",{"key":24,"text":230,"correct":22},"延期投入导致的损失",{"key":27,"text":232,"correct":32},"预算不准导致的成本超支",{"key":30,"text":234,"correct":22},"进度延误引发的第三方损失",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":27,"analysis":33},388780,"A公司的某项目即将开始，项目经理估计该项目10天即可完成，如果出现问题耽搁了也不会超过20天完成，最快6天即可完成。根据项目历时估计中的三点估算法，你认为该项目历时的估算标准差为 ：（ ）",[239,241,243,245],{"key":20,"text":240,"correct":22},"2.1天",{"key":24,"text":242,"correct":22},"2.2天",{"key":27,"text":244,"correct":32},"2.3天",{"key":30,"text":246,"correct":22},"2.4天",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":20,"analysis":33},388781,"某工程包括 A、 B、 C、 D、 E、 F、 G、H八个作业，各个作业的紧前作业、所需时间和所需人数如下表所示（假设每个人均能承担各个作业）：该工程的工期应为 （ ） 周",[251,253,255,257],{"key":20,"text":252,"correct":32},"8",{"key":24,"text":254,"correct":22},"9",{"key":27,"text":256,"correct":22},"10",{"key":30,"text":258,"correct":22},"11",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},388783,"软件需求分析和软件设计的关系是（ ）",[263,265,267,269],{"key":20,"text":264,"correct":32},"强制依赖关系",{"key":24,"text":266,"correct":22},"选择性依赖关系",{"key":27,"text":268,"correct":22},"外部依赖关系",{"key":30,"text":270,"correct":22},"内部依赖关系",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},388784,"公司接到一个项目，项目经理采用PERT方法对项目时间进行估算，乐观的时间是10天，悲观的时间是30天，最可能时间是20天",[275,276,277,278],{"key":20,"text":256,"correct":22},{"key":24,"text":206,"correct":32},{"key":27,"text":222,"correct":22},{"key":30,"text":279,"correct":22},"30",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":30,"analysis":33},388785,"在项目某阶段的实施过程中，A活动需要2天2人完成，B活动需要2天2人完成，C活动需要5天4人完成，D活动需要3天2人完成，E活动需要1天1人完成，该阶段的时标网络图如下。该项目组共有8人，且负责 A、E活动的人因另有安排，无法帮助其他人完成相应工作，且项目整个工期刻不容缓。以下 ______安排是恰当的，能够使实施任务顺利完成",[284,286,288,290],{"key":20,"text":285,"correct":22},"A. B.活动提前两天开始",{"key":24,"text":287,"correct":22},"B.活动推迟两天开始",{"key":27,"text":289,"correct":22},"活动提前两天开始",{"key":30,"text":291,"correct":32},"活动推迟两天开始",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":27,"analysis":33},388786,"在项目实施期间的某次周例会上，项目经理向大家通报了项目目前的进度。根据以下表格特征，目前的进度 （ ） 。",[296,298,300,302],{"key":20,"text":297,"correct":22},"提前计划7%",{"key":24,"text":299,"correct":22},"落后计划15%",{"key":27,"text":301,"correct":32},"落后计划7%",{"key":30,"text":303,"correct":22},"提前计划15%",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},388787,"图1是一个软件项目的活动图，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，则里程碑（ ）在关键路径上。",[308,309,310,311],{"key":20,"text":24,"correct":22},{"key":24,"text":27,"correct":32},{"key":27,"text":30,"correct":22},{"key":30,"text":312,"correct":22},"I",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":27,"analysis":33},388788,"某工程包括 A、 B、 C、 D、 E、 F、G七项工作，各工作的紧前工作、所需时间以及所需人数如下表所示（假设每个人均能承担各项工作）该工程的工期应为 （ ） 天。",[317,319,321,323],{"key":20,"text":318,"correct":22},"13",{"key":24,"text":320,"correct":22},"14",{"key":27,"text":322,"correct":32},"15",{"key":30,"text":324,"correct":22},"16",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":30,"analysis":33},388789,"项目绩效评审的主要目标是（）。",[329,331,333,335],{"key":20,"text":330,"correct":22},"根据项目的基准计划来决定完成该项目需要多少资源",{"key":24,"text":332,"correct":22},"根据过去的绩效调整进度和成本基准",{"key":27,"text":334,"correct":22},"得到客户对项目绩效认同",{"key":30,"text":336,"correct":32},"决定项目是否应该进入下一个阶段",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},388790,"（ ） 能最准确地计算活动的历时（A D）。",[341,343,345,347],{"key":20,"text":342,"correct":22},"A. AD=工作量\u002F人员生产率 B.",{"key":24,"text":344,"correct":32},"AD=工作量\u002F人力资源数量",{"key":27,"text":346,"correct":22},"AD=（最乐观时间+4最可能时间+最悲观时间）\u002F 6",{"key":30,"text":348,"correct":22},"AD=人员生产率&times;项目规模",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":24,"analysis":33},388791,"某项目经理在对项目历时进行估算时，认为正常情况下完成项目需要42天，同时也分析了影响项目工期的因素，认为最快可以在35天内完成工作，而在最不利的条件下则需要55天完成任务。采用三点估算得到的工期是 ___天",[353,355,357,359],{"key":20,"text":354,"correct":22},"42",{"key":24,"text":356,"correct":32},"43",{"key":27,"text":358,"correct":22},"44",{"key":30,"text":360,"correct":22},"45",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":27,"analysis":33},388792,"某信息系统项目在项目预测与评估的过程描述如下：①聘请多领域专家采取背对背的方式进行；②借助问卷获取专家的评估结论；③汇总问卷结果并在专家间传阅；④专家调整各自评估结论；⑤通过多轮征询获得专家对项目评估的一致见解。那么该项目的评估采用的方法是 （ ） 。",[365,367,369,371],{"key":20,"text":366,"correct":22},"相关关系法",{"key":24,"text":368,"correct":22},"头脑风暴法",{"key":27,"text":370,"correct":32},"德尔菲法",{"key":30,"text":372,"correct":22},"SWOT方法",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},388793,"某公司在项目执行过程中，对项目需求进行收集分析，并形成正式的项目文档，并由客户签字确认，但在交货时发现，实际产品与客户的要求大相径庭，客户拒绝付款。经调查研究发现，需求来源和低层需求实现不完全匹配，这可能是在 （ ） 方面出了问题。",[377,379,381,383],{"key":20,"text":378,"correct":22},"制定需求管理计划",{"key":24,"text":380,"correct":32},"维护对需求的双向跟踪性",{"key":27,"text":382,"correct":22},"求得对需求的承诺",{"key":30,"text":384,"correct":22},"管理需求变更",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":30,"analysis":33},388794,"创建WBS的输入包括 （ ） 。",[389,391,393,395],{"key":20,"text":390,"correct":22},"项目管理计划",{"key":24,"text":392,"correct":22},"成本估算",{"key":27,"text":394,"correct":22},"WBS模板",{"key":30,"text":396,"correct":32},"项目范围管理计划",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":27,"analysis":33},388795,"关于项目范围确认及有关活动，以下说法错误的是 （ ） 。",[401,403,405,407],{"key":20,"text":402,"correct":22},"可以通过检查来实现范围的确认",{"key":24,"text":404,"correct":22},"检查包括测量、测试、检验等活动",{"key":27,"text":406,"correct":32},"范围确认的目的就是形成项目范围说明书",{"key":30,"text":408,"correct":22},"检查也可被称为审查、产品评审和走查",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":20,"analysis":33},388796,"（ ）工作用来对项目进行定义，该工作用来明确“项目需要做什么”。",[413,415,417,419],{"key":20,"text":414,"correct":32},"制定项目范围说明书",{"key":24,"text":416,"correct":22},"制定项目管理计划",{"key":27,"text":418,"correct":22},"制定项目章程",{"key":30,"text":420,"correct":22},"项目管理信息系统",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":24,"analysis":33},388797,"在编制WBS时，应考虑以下（ ）基本原则。①每个WBS元素都代表一个独立的、有形或无形的可交付成果②可交付成果中包括最终可交付物和为实现最终结果所需要的中间可交付物③每个WBS元素应只从属一个母层次的WBS元素或子层次的WBS元素④每个工作包都应可以分配给一名项目团队成员或一家分包商单独负责⑤可交付成果具有唯一性、独特性",[425,427,429,431],{"key":20,"text":426,"correct":22},"①②③④",{"key":24,"text":428,"correct":32},"①②④⑤",{"key":27,"text":430,"correct":22},"①②③⑤",{"key":30,"text":432,"correct":22},"②③④⑤",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":27,"analysis":33},388798,"某公司最近在一家大型企业OA项目招标中胜出，小张被指定为该项目的项目经理。公司发布了项目章程，小张依据该章程等项目资料编制了由项目目标、可交付成果、项目边界及成本和质量测量指标等内容组成的 。",[437,439,441,442],{"key":20,"text":438,"correct":22},"项目工作说明书",{"key":24,"text":440,"correct":22},"范围管理计划",{"key":27,"text":75,"correct":32},{"key":30,"text":443,"correct":22},"WBS",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},388799,"公司上个月取消了由张工管理的视频游戏项目的需求定义文件和范围说明。现在公司要求将该项目成果变成可在个人电视及计算机上玩的交互游戏。这至少 （ ） 。",[448,450,452,454],{"key":20,"text":449,"correct":32},"需要修改项目既定的由WBS定义的范围",{"key":24,"text":451,"correct":22},"导致所有项目基准的改变",{"key":27,"text":453,"correct":22},"导致成本、时间、质量和其他目标的调整",{"key":30,"text":455,"correct":22},"会得到一个教训",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":27,"analysis":33},388800,"在软件开发项目中，关键路径是项目事件网络中 （66） ，组成关键路径的活动称为关键活动",[460,462,464,466],{"key":20,"text":461,"correct":22},"最长的回路",{"key":24,"text":463,"correct":22},"最短的回路",{"key":27,"text":465,"correct":32},"源点和汇点间的最长路径",{"key":30,"text":467,"correct":22},"源点和汇点间的最短路径",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},388801,"小王所在单位的项目管理委员会每月开一次项目评审会，负责对任何预算在一百万元以上项目的实施情况进行评审。小王最近被提升为高级项目经理并负责管理一个大型项目，项目管理委员会要求小王介绍项目目标、边界和配置管理等材料。为此，小王需要准备（ ） 。",[472,474,476,478],{"key":20,"text":473,"correct":22},"总体设计方案",{"key":24,"text":475,"correct":32},"项目范围说明书",{"key":27,"text":477,"correct":22},"产品描述",{"key":30,"text":479,"correct":22},"WBS和WBS字典",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":20,"analysis":33},388802,"某信息系统应用软件的WBS分解结构图，其中空白方框处应该填写的内容是（ ）。",[484,486,488,490],{"key":20,"text":485,"correct":32},"产品需求",{"key":24,"text":487,"correct":22},"需求规格说明书",{"key":27,"text":489,"correct":22},"需求评审",{"key":30,"text":491,"correct":22},"需求变更",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":24,"analysis":33},388803,"项目经理向干系人说明项目范围时，应以 （ ） 为依据。",[496,498,499,500],{"key":20,"text":497,"correct":22},"合同",{"key":24,"text":475,"correct":32},{"key":27,"text":443,"correct":22},{"key":30,"text":501,"correct":22},"产品说明书",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":24,"analysis":33},388804,"项目范围管理包括确保项目成功所需的全部工作过程。 （ ） 是范围管理流程的正确顺序。 ①定义范围 ②核实范围 ③收集需求④控制范围 ⑤创建工作分解结构",[506,508,510,512],{"key":20,"text":507,"correct":22},"③①②⑤④",{"key":24,"text":509,"correct":32},"③①⑤②④",{"key":27,"text":511,"correct":22},"①③②④⑤",{"key":30,"text":513,"correct":22},"①③②⑤④",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},388805,"项目经理要对WBS中标号为2.2.3号的工作包设定一个控制点，以便对其成本、进度、质量进行监控，再次比较适合设定一个 （ ） 。",[518,520,522,524],{"key":20,"text":519,"correct":22},"WBS字典",{"key":24,"text":521,"correct":32},"控制账户",{"key":27,"text":523,"correct":22},"账户编码",{"key":30,"text":525,"correct":22},"活动基线",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":20,"analysis":33},388806,"多个项目需要同一资源，否则不便能实施。为使延误的项目数最少，应将该资源优先分配给 （ ）",[530,532,534,536],{"key":20,"text":531,"correct":32},"总时差最短的项目",{"key":24,"text":533,"correct":22},"历时最短的项目",{"key":27,"text":535,"correct":22},"计划开始最早的项目",{"key":30,"text":537,"correct":22},"计划结束最晚的项目",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},388807,"某项目计划08年12月5日开始进入首批交付的产品测试工作，估算工作量为8（人）×10（天），误差为2天，则以下（）理解正确（天指工作日）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"表示活动至少需要8人天，最多不超过10人天",{"key":24,"text":545,"correct":32},"表示活动至少需要8天，最多不超过12天",{"key":27,"text":547,"correct":22},"表示活动至少需要64人天，最多不超过112人天",{"key":30,"text":549,"correct":22},"表示活动至少需要64天，最多不超过112天",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},388808,"项目进度控制是依据项目进度基准计划对项目的实际进度进行监控，使项目能够按时完成。以下关于项目进度控制的叙述中，（ ）是不正确的。",[554,556,558,560],{"key":20,"text":555,"correct":32},"项目进度至关重要，因此进度控制需要在项目初期优先关注",{"key":24,"text":557,"correct":22},"进度控制必须与其他变化控制，包括成本控制与范围控制紧密结合",{"key":27,"text":559,"correct":22},"项目进度控制是项目整体控制的一个组成部分",{"key":30,"text":561,"correct":22},"对项目进度的控制，应重点关注进展报告和执行状态报告",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":30,"analysis":33},388809,"某软件的工作量是20000行，由4人组成的开发小组开发，每个程序员的生成效率是5000行／人月，每队程序员的沟通成本是250行／人月，则该软件需要开发（ ）月。",[566,568,570,572],{"key":20,"text":567,"correct":22},"1",{"key":24,"text":569,"correct":22},"1.04",{"key":27,"text":571,"correct":22},"1.05",{"key":30,"text":573,"correct":32},"1.08",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},388810,"一个活动，最乐观估算要6天：最可能估算要21天；最悲观估算要36天；那么，该活动在16天到26天的时间完成的几率为（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"54%",{"key":24,"text":581,"correct":32},"68%",{"key":27,"text":583,"correct":22},"95%",{"key":30,"text":585,"correct":22},"99.73%",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},388811,"一个估算员判定一个任务乐观估计需5天完成，悲观估计16天，但通常会花8天，采用三点估算得到的工期是（ ）天。",[590,592,594,596,598],{"key":20,"text":591,"correct":22},"8.0",{"key":24,"text":593,"correct":32},"8.8",{"key":27,"text":595,"correct":22},"9.1",{"key":30,"text":597,"correct":22},"9.7",{"key":599,"text":600,"correct":22},"E","10.5",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":27,"analysis":33},388812,"某项目由P1、P2、P3、P4、P5五个活动组成，五个活动全部完成之后项目才能够完成，每个活动都需要用到R1、R2、R3三种互斥资源，三种资源都必须达到活动的资源需求量，活动才能开始。已分配资源只有在完成本活动后才能被其他活动所用。目前项目经理能够调配的资源有限，R1、R2、R3的可用资源数分别为9、8、5。活动对资源的需求量、已分配资源数和各活动历时如下表所示(假设各活动之间没有依赖关系): 在资源受限的情况下，通过最优化的活动安排，达到最短时间完成项目的目的。经分析P2P4并行，活动总历时（）周。",[605,606,608,610],{"key":20,"text":567,"correct":22},{"key":24,"text":607,"correct":22},"2",{"key":27,"text":609,"correct":32},"3",{"key":30,"text":611,"correct":22},"4",[613,617,620,623,626,629],{"id":614,"name":615,"category":7,"favorite":616},136,"法律职业试卷二(客观题 )",2,{"id":618,"name":619,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":621,"name":622,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":624,"name":625,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":627,"name":628,"category":7,"favorite":8},28,"安全工程师",{"id":630,"name":631,"category":7,"favorite":8},112,"安全生产法律知识"]