[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,11,50,1856,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,225,237,249,261,273,285,297,309,320,332,342,352,364,376,388,400,412,424,436,448,460,472,484,496,508,517,529,541,553,565,577,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},388712,1,"单选题","以下关于工作包的描述，正确的是（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","可以在此层面上对其成本和进度进行可靠的估算",true,{"key":24,"text":25,"correct":26},"B","工作包是项目范围管理计划关注的内容之一",false,{"key":28,"text":29,"correct":26},"C","工作包是WBS的中间层",{"key":31,"text":32,"correct":26},"D","不能支持未来的项目活动定义","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},388713,"小王正在负责管理一个产品开发项目。开始时产品被定义为“最先进的个人数码产品”，后来被描述为“先进个人通信工具”。在市场人员的努力下该产品与某市交通局签订了采购意向书，随后与用户、市场人员和研发工程师进行了充分的讨论后，被描述为“成本在1000元以下，能通话、播放MP3、能运行Win CE的个人掌上电脑”。这表明产品的特征正在不断改进，但是小王还需将（）与其相协调。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目范围定义",{"key":24,"text":41,"correct":26},"项目干系人利益",{"key":28,"text":43,"correct":26},"范围变更控制系统",{"key":31,"text":45,"correct":26},"用户的战略计划",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},388714,"下列关于需求变更影响分析的做法中， （ ） 是错误的。",[50,52,54,56],{"key":20,"text":51,"correct":26},"需求主管人员把需求变更的优先级分为5级",{"key":24,"text":53,"correct":26},"建立一个需求决策数据库，根据数据库内容知道变更决策",{"key":28,"text":55,"correct":22},"没有代价或不影响进度的变更可以直接实施",{"key":31,"text":57,"correct":26},"变更分析流程需考虑：涉及问题核对，影响软件元素核对，评估变更工时、评估工作值总和、任务顺序、变更对路径的影响，对进度成本的影响、优先级等",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},388715,"某软件项目实施过程中产生的一个文档的主要内容如下所示，该文档的主要作用是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"工作分解",{"key":24,"text":65,"correct":26},"测试说明",{"key":28,"text":67,"correct":22},"需求跟踪",{"key":31,"text":69,"correct":26},"设计验证",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},388716,"以下关于工作分解结构（WBS）的说法中， （ ） 是正确的。",[74,76,78,80],{"key":20,"text":75,"correct":22},"凡是出现在 WBS 中的工作都属于项目的范围，凡是没有出现在 WBS 中的工作都不属于项目的范围，要想完成这样的工作，必须遵守变更控制流程",{"key":24,"text":77,"correct":26},"WBS最底层的工作单元叫工作包，一个项目的 WBS 应在项目早期就分解到最底层",{"key":28,"text":79,"correct":26},"树状结构的WBS直观，层次清晰，适用于大型的项目",{"key":31,"text":81,"correct":26},"业界一般把1个人40个小时能干完的工作称为1个工作包，依据分解得到的工作包能够可靠地估计出成本和进度",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},388717,"软件需求包括三个不同的层次，分别为业务需求、用户需求和功能及非功能需求，（ )属于用户需求。",[86,88,90,92],{"key":20,"text":87,"correct":26},"A. 反映了组织机构或客户对系统、产品高层次的目标要求，其在项目视图与范围文档中予以说明",{"key":24,"text":89,"correct":22},"描述用户使用产品必须要完成的任务，其在使用实例文档或方案脚本说明中予以说明",{"key":28,"text":91,"correct":26},"定义了开发人员必须实现的软件功能，使得用户能完成他们的任务，从而满足业务需求",{"key":31,"text":93,"correct":26},"软件产品为了满足用户的使用，对用户开发、处理速度、安全性能等方面的需求",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},388718,"项目经理在进行大项目的WBS分解时， （ ） 是错误的。",[98,100,102,104],{"key":20,"text":99,"correct":26},"按照项目的组织结构编制树形结构的WBS",{"key":24,"text":101,"correct":26},"按照项目的产品结构编制列表式的WBS",{"key":28,"text":103,"correct":26},"按照项目的生命周期编制鱼刺图式WBS",{"key":31,"text":105,"correct":22},"按照项目风险分解结构编制树形结构的WBS",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},388719,"创建工作分解结构是项目范围管理的重要内容，该项活动的输出包括工作分解结构（WBS）、WBS字典、变更申请、范围管理计划（更新）和 （ ） 。",[110,112,114,116],{"key":20,"text":111,"correct":22},"范围基线",{"key":24,"text":113,"correct":26},"项目章程",{"key":28,"text":115,"correct":26},"绩效报告",{"key":31,"text":117,"correct":26},"工作说明书",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},388720,"需求分析是软件定义阶段中的最后一步，在这个阶段确定系统必须完成哪些工作，对目标系统提出完整、准确、清晰、具体的要求。一般来说，软件需求分析可分为（ ）三个阶段。",[122,124,126,128],{"key":20,"text":123,"correct":26},"需求分析、需求描述及需求评审",{"key":24,"text":125,"correct":26},"需求提出、需求描述及需求验证",{"key":28,"text":127,"correct":26},"需求分析、需求评审及需求验证",{"key":31,"text":129,"correct":22},"需求提出、需求描述及需求评审",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},388721,"以下关于需求定义的叙述中，（ ）是正确的。",[134,136,138,140],{"key":20,"text":135,"correct":22},"需求定义的目标是根据需求调査和需求分析的结果，进一步定义准确无误的产品需求,形成《需求规格说明书》",{"key":24,"text":137,"correct":26},"《需求规格说明书》将只交给甲方作为验收依据，乙方开发人员不需要了解",{"key":28,"text":139,"correct":26},"需求定义的目的是对各种需求信息进行分析并抽象描述，为目标系统建立一个概念模型",{"key":31,"text":141,"correct":26},"需求定义是指开发方和用户共同对需求文档评审，经双方对需求达成共识后做出书面承诺，使需求文档具有商业合同效果",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},388722,"王工作为一个大项目的项目经理，最近将其中一个子项目分派给了一个分包商，李华是分包商的项目经理，刚刚从事项目管理工作，但是与王工比较熟悉。王工可建议李华首先（41） 。",[146,148,150,152],{"key":20,"text":147,"correct":26},"遵照王工为项目制订的WBS，直接使用王工确定的工作包来管理子项目",{"key":24,"text":149,"correct":22},"指定该子项目的WBS",{"key":28,"text":151,"correct":26},"建立类似的编码结构，以便于应用公共项目管理信息系统",{"key":31,"text":153,"correct":26},"建立一个WBS字典来显示详细的人员分工",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},388723,"在WBS字典中，可不包括的是 （ ） 。",[158,160,162,164],{"key":20,"text":159,"correct":26},"工作概述",{"key":24,"text":161,"correct":26},"账户编码",{"key":28,"text":163,"correct":22},"管理储备",{"key":31,"text":165,"correct":26},"资源需求",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},388724,"某工程包括 A、 B、 C、 D、 E、 F、G七个作业，各个作业的紧前作业、所需时间、所需人数如下表： 该工程的计算工期为 （ ） 周。",[170,172,174,176],{"key":20,"text":171,"correct":22},"7",{"key":24,"text":173,"correct":26},"8",{"key":28,"text":175,"correct":26},"10",{"key":31,"text":177,"correct":26},"13",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},388725,"下图中的关键路径历时 （ ） 个时间单位。",[182,184,186,188],{"key":20,"text":183,"correct":26},"14",{"key":24,"text":185,"correct":26},"18",{"key":28,"text":187,"correct":22},"23",{"key":31,"text":189,"correct":26},"25",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},388726,"关键路径法是利用进度计划网络图所进行的一种分析技术，下面关于关键路径的说法中正确的是 （ ）",[194,196,198,200],{"key":20,"text":195,"correct":26},"网络图中只有一条关键路径",{"key":24,"text":197,"correct":26},"关键路径上各活动的时间之和最少",{"key":28,"text":199,"correct":26},"非关键路径上某活动发生延误后项目总工期必然会发生延误",{"key":31,"text":201,"correct":22},"非关键路径上的活动延误时间如果不超过总时差，项目总工期就不会发生延误",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},388727,"某项工程由下列活动组成： （ ） 是该工程的关键路径。",[206,208,210,212],{"key":20,"text":207,"correct":26},"ABEHJ",{"key":24,"text":209,"correct":22},"ACDHJ",{"key":28,"text":211,"correct":26},"ACGIJ",{"key":31,"text":213,"correct":26},"ACFJ",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},388728,"图1是一个软件项目的活动图，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，若在实际项目进展中，活动AD在活动AC开始3天后才开始，而完成活动DG过程中，由于临时事件发生，实际需要15天才能完成，则完成该项目的最短时间比原计划多了（ ）天。",[218,219,221,223],{"key":20,"text":173,"correct":26},{"key":24,"text":220,"correct":22},"3",{"key":28,"text":222,"correct":26},"5",{"key":31,"text":224,"correct":26},"6",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":28,"analysis":33},388729,"以下不具有“完成—开始”关系的两个活动是 （ ） 。",[229,231,233,235],{"key":20,"text":230,"correct":26},"系统设计，设计评审",{"key":24,"text":232,"correct":26},"系统分析，需求评审",{"key":28,"text":234,"correct":22},"需求评审，周例会",{"key":31,"text":236,"correct":26},"确定项目范围，制订WBS",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},388730,"从上图可以直观地看出，关键路径为ACEG H，工程工期为2+1+2+2+1=8。",[241,243,245,247],{"key":20,"text":242,"correct":22},"事前绩效审计",{"key":24,"text":244,"correct":26},"事中绩效审计",{"key":28,"text":246,"correct":26},"执行审计",{"key":31,"text":248,"correct":26},"事后绩效审计",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":31,"analysis":33},388731,"资源分析人员在对某项目进行活动资源估算分析时，发现的主要问题是：该项目依赖张工的经验和个人能力，但同时张工还在其他项目中担任重要角色。为了保证项目资源的使用不发生冲突，资源分析人员在进行资源估算时应提交 （ ） 。",[253,255,257,259],{"key":20,"text":254,"correct":26},"专家评审意见",{"key":24,"text":256,"correct":26},"活动属性",{"key":28,"text":258,"correct":26},"资源类比估算清单",{"key":31,"text":260,"correct":22},"活动资源日历",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},388732,"下图3是一个软件项目的活动图，其中顶点表示项目里程碑，连接顶点的边表示包含的活动，活动FG的松弛时间为（2）。",[265,267,269,271],{"key":20,"text":266,"correct":26},"19",{"key":24,"text":268,"correct":22},"20",{"key":28,"text":270,"correct":26},"21",{"key":31,"text":272,"correct":26},"24",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":28,"analysis":33},388733,"以下工程进度网络图中，若结点0和6分别表示起点和终点，则关键路径为 （ ） 。",[277,279,281,283],{"key":20,"text":278,"correct":26},"0→1→3→6",{"key":24,"text":280,"correct":26},"0→1→4→6",{"key":28,"text":282,"correct":22},"0→1→2→4→6",{"key":31,"text":284,"correct":26},"0→2→5→6",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},388734,"（ ）通过增加资源，以最小的成本增加来压缩进度工期的一种技术",[289,291,293,295],{"key":20,"text":290,"correct":26},"资源平滑",{"key":24,"text":292,"correct":26},"资源平衡",{"key":28,"text":294,"correct":26},"快速跟进",{"key":31,"text":296,"correct":22},"赶工",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},388735,"项目进度管理经常采用箭线图法，以下对箭线图的描述不正确的是 （ ） 。",[301,303,305,307],{"key":20,"text":302,"correct":26},"流入同一节点的活动，有相同的后继活动",{"key":24,"text":304,"correct":22},"虚活动不消耗时间，但消耗资源",{"key":28,"text":306,"correct":26},"箭线图中可以有两条关键路径",{"key":31,"text":308,"correct":26},"两个相关节点之间只能有一条箭线",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":31,"analysis":33},388736,"下图中，工作E总时差是 （ ） 。",[313,315,317,318],{"key":20,"text":314,"correct":26},"1",{"key":24,"text":316,"correct":26},"2",{"key":28,"text":220,"correct":26},{"key":31,"text":319,"correct":22},"4",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":28,"analysis":33},388737,"项目经理向往在做软件项目成本估算时，先考虑了最不利的情况，估算出项目成本为120人日，又考虑了最有利的情况下项目成本为60人日，最后考虑一般情况下的项目成本可能为75人日，该项目最终的成本预算应为（ ）人日",[324,326,328,330],{"key":20,"text":325,"correct":26},"100",{"key":24,"text":327,"correct":26},"90",{"key":28,"text":329,"correct":22},"80",{"key":31,"text":331,"correct":26},"75",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},388738,"某项目完成估计需要12个月。在进一步分析后认为最少将花8个月，最糟糕的情况下将花28个月。那么，这个估计的PERT值是（）个月。",[336,338,340,341],{"key":20,"text":337,"correct":26},"9",{"key":24,"text":339,"correct":26},"11",{"key":28,"text":177,"correct":26},{"key":31,"text":183,"correct":22},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":28,"analysis":33},388739,"某工程包括 A、 B、 C、 D、 E、F 六个作业，分别需要 5、7、3、4、15、12 天。A 必须在 C、D 开始之前完成， B、D 必须在 E 开始之前完成，C 必须在 F 开始之前完成，F 不能在 B、D 完成之前开始。该工程的工期至少需要（ ）天。",[346,347,349,350],{"key":20,"text":270,"correct":26},{"key":24,"text":348,"correct":26},"22",{"key":28,"text":272,"correct":22},{"key":31,"text":351,"correct":26},"46",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":20,"analysis":33},388740,"在项目进度控制中，（）不适合用于缩短活动工期。",[356,358,360,362],{"key":20,"text":357,"correct":22},"准确确定项目进度的当前状态",{"key":24,"text":359,"correct":26},"投入更多的资源",{"key":28,"text":361,"correct":26},"改进技术",{"key":31,"text":363,"correct":26},"缩减活动范围",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":31,"analysis":33},388741,"一项任务的最早开始时间是第3天，最晚开始时间是第13天，最早完成时间是第9天，最晚完成时间是第19天。该任务____ 。",[368,370,372,374],{"key":20,"text":369,"correct":26},"在关键路径上",{"key":24,"text":371,"correct":26},"有滞后",{"key":28,"text":373,"correct":26},"进展情况良好",{"key":31,"text":375,"correct":22},"不在关键路径上",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":31,"analysis":33},388742,"关于活动资源估算正确的叙述是 （ ） 。",[380,382,384,386],{"key":20,"text":381,"correct":26},"进行活动排序时需要考虑活动资源估算问题",{"key":24,"text":383,"correct":26},"活动资源估算过程与费用估算过程无关",{"key":28,"text":385,"correct":26},"活动资源估算的目的是确定实施项目活动所需的资源数量",{"key":31,"text":387,"correct":22},"企业基础设施资源信息可以用于活动资源估算",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":28,"analysis":33},388743,"在下面的项目网络图中（时间单位为天），如果活动A的实际开始时间是5月1日早8时，在不延误工期的情况下，活动B最晚应在 （ ） 前结束。",[392,394,396,398],{"key":20,"text":393,"correct":26},"5月5日早8时",{"key":24,"text":395,"correct":26},"5月6日早8时",{"key":28,"text":397,"correct":22},"5月7日早8时",{"key":31,"text":399,"correct":26},"5月8日早8时",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":20,"analysis":33},388744,"多个项目需要同一资源，否则不便能实施。为使延误的项目数最少，应将该资源优先分配给 （ ） 。",[404,406,408,410],{"key":20,"text":405,"correct":22},"总时差最短的项目",{"key":24,"text":407,"correct":26},"历时最短的项目",{"key":28,"text":409,"correct":26},"计划开始最早的项目",{"key":31,"text":411,"correct":26},"计划结束最晚的项目",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":28,"analysis":33},388745,"项目经理小张对自己正在做的一个项目进行成本挣值分析后，画出了如下所示的一张图，当前时间为图中的检查日期。根据该图小张分析：该项目进度 （ ）。",[416,418,420,422],{"key":20,"text":417,"correct":26},"正常",{"key":24,"text":419,"correct":26},"落后",{"key":28,"text":421,"correct":22},"超前",{"key":31,"text":423,"correct":26},"无法判断",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},388746,"关于活动历时估算的说法不正确的是 （ ） 。",[428,430,432,434],{"key":20,"text":429,"correct":26},"活动历时估算不是进行活动排序时首要考虑的问题",{"key":24,"text":431,"correct":22},"活动历时估算的准确性不依赖于项目团队成员对项目的熟悉程度",{"key":28,"text":433,"correct":26},"活动历时估算内容包括确定实施项目活动必须付出的工作努力、所需的资源数量、工作时间",{"key":31,"text":435,"correct":26},"活动历时估算可采用三点估算法",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},388747,"（ ） 不是获取需求的方法。",[440,442,444,446],{"key":20,"text":441,"correct":26},"问卷调查",{"key":24,"text":443,"correct":26},"会议讨论",{"key":28,"text":445,"correct":26},"获取原型",{"key":31,"text":447,"correct":22},"决策分析",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},388748,"项目范围说明书（初步）的内容不包括 （ ） 。",[452,454,456,458],{"key":20,"text":453,"correct":26},"项目和范围的目标",{"key":24,"text":455,"correct":26},"产品或服务的需求和特点",{"key":28,"text":457,"correct":26},"项目需求和交付物",{"key":31,"text":459,"correct":22},"项目计划网络图",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},388749,"以下关于需求分析的叙述中，不正确的是： （ ） 。",[464,466,468,470],{"key":20,"text":465,"correct":26},"需求分析的目的是确定系统必须完成哪些工作，对目标系统提出完整、准确、清晰、具体的要求",{"key":24,"text":467,"correct":22},"完整的需求分析过程包括：获取用户需求、分析用户需求、编写需求说明书三个过程",{"key":28,"text":469,"correct":26},"根据项目的复杂程度，需求分析的工作可以由专门的系统分析人员来做，也可以由项目经理带领技术人员完成",{"key":31,"text":471,"correct":26},"软件需求分为三个层次：业务需求、用户需求、功能需求与非功能需求",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":28,"analysis":33},388750,"（ ） 是指包含所有必需的工作，并且能成功地完成一个项目所需的工作。管理项目的范围主要涉及识别与控制不包括在项目中的内容。",[476,478,480,482],{"key":20,"text":477,"correct":26},"创造范围",{"key":24,"text":479,"correct":26},"项目干系人管理",{"key":28,"text":481,"correct":22},"项目范围管理",{"key":31,"text":483,"correct":26},"项目成本管理",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},388751,"（ ） 不属于范围变更控制的工作。",[488,490,492,494],{"key":20,"text":489,"correct":26},"确定影响导致范围变更的因素，并尽量使这些因素向有利的方面发展",{"key":24,"text":491,"correct":26},"判断范围变更是否已经发生",{"key":28,"text":493,"correct":26},"管理范围变更，确保所有被请求变更按照项目整体变更控制过程处理",{"key":31,"text":495,"correct":22},"确定范围正式被接受的标准和要素",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":28,"analysis":33},388752,"典型的信息系统项目开发的过程中， （ ）阶段拟定了系统的目标、范围和要求，而系统各模块的算法一般在 （请作答此空） 阶段确定。",[500,502,504,506],{"key":20,"text":501,"correct":26},"概要设计",{"key":24,"text":503,"correct":26},"需求分析",{"key":28,"text":505,"correct":22},"详细设计",{"key":31,"text":507,"correct":26},"架构设计",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},388753,"典型的信息系统项目开发的过程中， （请作答此空） 阶段拟定了系统的目标、范围和要求；而系统各模块的算法一般在 （ 此空不作答）阶段确定。",[512,513,514,515],{"key":20,"text":501,"correct":26},{"key":24,"text":503,"correct":22},{"key":28,"text":505,"correct":26},{"key":31,"text":516,"correct":26},"程序设计",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},388754,"在创建工作分解结构时，描述生产一个产品所需要的实际部件、组件的分解层次表格称为 （ ） 。",[521,523,525,527],{"key":20,"text":522,"correct":26},"风险分解结构",{"key":24,"text":524,"correct":22},"物料清单",{"key":28,"text":526,"correct":26},"组织分解结构",{"key":31,"text":528,"correct":26},"资源分解结构",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},388755,"（ ） 属于控制范围的活动。",[533,535,537,539],{"key":20,"text":534,"correct":26},"与客户仔细讨论项目范围说明书，并请客户签字",{"key":24,"text":536,"correct":22},"当客户提出新的需求时，说服用户放弃新的需求",{"key":28,"text":538,"correct":26},"确认项目范围是否覆盖了需要完成的产品或服务进行的所有活动",{"key":31,"text":540,"correct":26},"确认每项工作是否有明确的质量标准",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":28,"analysis":33},388756,"在系统建设后期，建设方考虑到系统运维管理问题，希望增加8课时的IT服务管理方面的知识培训，承建方依此要求进行了范围变更。在对范围变更进行验证时，验证准则是（ ） 。",[545,547,549,551],{"key":20,"text":546,"correct":26},"学员签到表",{"key":24,"text":548,"correct":26},"安排一次考试，以测验分数",{"key":28,"text":550,"correct":22},"新批准的培训工作方案",{"key":31,"text":552,"correct":26},"培训范围变更请求",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},388757,"（ ） 不是WBS的正确分解方法或结构。",[557,559,561,563],{"key":20,"text":558,"correct":26},"把主要的项目可交付物和子项目作为第一层",{"key":24,"text":560,"correct":22},"在同一WBS层上采用不同的分解方法",{"key":28,"text":562,"correct":26},"在不同WBS层上可采用不同的分解方法",{"key":31,"text":564,"correct":26},"把项目生命期作为第一层，项目交付物作为第二层",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},388758,"某项目经理张先生在确定项目范围过程中，已得到项目章程、工作说明书、企业环境因素和组织过程资产等信息，他立刻组织项目团队管理人员，并聘请有关专家，采用项目管理信息系统、项目管理方法论工具，确定项目需要完成的工作，在上述工作结束后，相应的输出是 （ ） 。",[569,571,573,575],{"key":20,"text":570,"correct":26},"项目进度计划",{"key":24,"text":572,"correct":22},"项目范围说明书",{"key":28,"text":574,"correct":26},"工作绩效报告",{"key":31,"text":576,"correct":26},"项目审计报告",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},388759,"一个新软件产品的构建阶段即将完工，下一个阶段是测试和执行，这个进度计划提前了两周。在进入最后阶段之前，项目经理最应该关注 （ ） 。",[581,583,585,586],{"key":20,"text":582,"correct":22},"范围确认",{"key":24,"text":584,"correct":26},"风险控制",{"key":28,"text":115,"correct":26},{"key":31,"text":587,"correct":26},"成本控制",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":31,"analysis":33},388760,"在某信息系统建设项目中，以下做法不正确的是 （ ） 。",[592,594,596,598],{"key":20,"text":593,"correct":26},"项目经理没有制订单独的范围管理计划，而是在项目管理计划中进行了说明",{"key":24,"text":595,"correct":26},"进行范围定义的主要工作是确定产生所交付信息系统的过程并把结果记录下来",{"key":28,"text":597,"correct":26},"范围定义完成后，项目经理就开始进行WBS分解",{"key":31,"text":599,"correct":22},"WBS分解完成后，所有的项目活动被直接分解到工作包，项目组成员马上按照WBS的活动开展自己的工作",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":20,"analysis":33},388761,"某项目工期为一年，项目经理对负责项目工作分解结构编制的小张提出了如下要求或建议，其中 （ ） 是不妥当的。",[604,606,608,610],{"key":20,"text":605,"correct":22},"应该在两周内把全年工作都分解到具体工作包",{"key":24,"text":607,"correct":26},"可根据项目生命周期的阶段进行第一层分解，而把可交付物安排在第二层",{"key":28,"text":609,"correct":26},"可考虑以一个人80小时能完成的工作作为一个工作包",{"key":31,"text":611,"correct":26},"可采用树形结构和列表形式相结合的方式进行分解",[613,617,620,623,626,629],{"id":614,"name":615,"category":7,"favorite":616},136,"法律职业试卷二(客观题 )",2,{"id":618,"name":619,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":621,"name":622,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":624,"name":625,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":627,"name":628,"category":7,"favorite":8},28,"安全工程师",{"id":630,"name":631,"category":7,"favorite":8},112,"安全生产法律知识"]