[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-172-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},172,"(高级)信息系统项目管理师","职业资格",0,10,50,1856,[13,34,46,58,70,80,92,104,116,128,140,152,164,176,188,200,212,224,236,248,260,272,284,296,308,320,331,342,353,365,377,389,401,413,424,436,448,460,472,484,496,505,515,527,539,551,563,575,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},388660,1,"单选题","项目经理对项目负责，其正式权利由（ ）获得。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","项目工作说明书",false,{"key":24,"text":25,"correct":22},"B","成本管理计划",{"key":27,"text":28,"correct":22},"C","项目资源日历",{"key":30,"text":31,"correct":32},"D","项目章程",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},388661,"甲公司拟收购乙公司以扩充自身的业务范围，张工被甲公司指定为此次收购的项目经理，首席财务官给了张工一份项目章程，介绍这次收购将如何改进公司产品的市场渗透和打开一条新的销售渠道。张工使用这份项目章程，定义了可交付成果和主要项目目标，包括成本、进度和质量测量指标。则张工准备的是 （ ） 。",[38,40,42,44],{"key":20,"text":39,"correct":22},"范围管理计划",{"key":24,"text":41,"correct":22},"项目计划",{"key":27,"text":43,"correct":32},"范围说明书",{"key":30,"text":45,"correct":22},"工作分解结构",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},388662,"价值活动是企业从事的物质上和技术上的界限分明的各项活动，是企业生产对买方有价值产品的基石。价值活动分为基本活动和辅助活动，其中，基本活动包括 （ ） 等活动。 ①内部后勤 ②外部后勤 ③生产经营 ④采购 ⑤人力资源管理 ⑥市场营销",[50,52,54,56],{"key":20,"text":51,"correct":22},"①③④⑥",{"key":24,"text":53,"correct":22},"①②⑤⑥",{"key":27,"text":55,"correct":22},"②③④⑤",{"key":30,"text":57,"correct":32},"①②③⑥",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},388663,"项目章程发布的目标一般不包括 ：",[62,64,66,68],{"key":20,"text":63,"correct":22},"使项目与组织的日常经营联系起来",{"key":24,"text":65,"correct":22},"进一步确定客户的商业需求，以及对客户需求的理解",{"key":27,"text":67,"correct":22},"为项目经理使用组织资源进行项目活动进行授权",{"key":30,"text":69,"correct":32},"确认项目团队成员的具体任务分工",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},388664,"某项目经理所在的单位正在启动一个新的项目，配备了虚拟项目小组，根据过去的经验，该项目经理认识到矩阵环境下的小组成员有时对职能经理的配合超过对项目经理的配合，因此，该项目经理决定请求单位制订 （ ）",[74,75,76,78],{"key":20,"text":41,"correct":22},{"key":24,"text":31,"correct":32},{"key":27,"text":77,"correct":22},"项目范围说明书",{"key":30,"text":79,"correct":22},"人力资源管理计划",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":24,"analysis":33},388665,"某项目范围基准发生变化，经 （ ） 同意，对需求规格说明书进行变更，则该配置项的状态应从 （请作答此空） 。",[84,86,88,90],{"key":20,"text":85,"correct":22},"\"草稿\"变迁为\"正在修改\"",{"key":24,"text":87,"correct":32},"\"正式发布\"变迁为\"正在修改\"",{"key":27,"text":89,"correct":22},"\"Check in\"变迁为\"Check out\"",{"key":30,"text":91,"correct":22},"\"Check out\"变迁为\"Check in\"",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":30,"analysis":33},388666,"某项目范围基准发生变化，经 （请作答此空） 同意，对需求规格说明书进行变更，则该配置项的状态应从 （ ） 。",[96,98,100,102],{"key":20,"text":97,"correct":22},"项目经理",{"key":24,"text":99,"correct":22},"技术负责人",{"key":27,"text":101,"correct":22},"配置管理员",{"key":30,"text":103,"correct":32},"变更控制委员会",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":30,"analysis":33},388667,"在进行项目需求管理时，某需求的状态描述是\"该需求已被分析，估计了其对项目余下部分的影响，已用一个明确的产品版本号或创建编号分配到相关的基线中，软件开发团队已同意实现该需求\"，则这个需求状态值是 （ ） 。",[108,110,112,114],{"key":20,"text":109,"correct":22},"已建议",{"key":24,"text":111,"correct":22},"已验证",{"key":27,"text":113,"correct":22},"已实现",{"key":30,"text":115,"correct":32},"已批准",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":27,"analysis":33},388668,"项目的需求文档应精准描述要交付的产品，应能反映出项目的变更。当不得不做出变更时，应该 （ ） 对被影响的需求文件进行处理。",[120,122,124,126],{"key":20,"text":121,"correct":22},"从关注高层系统需求变更的角度",{"key":24,"text":123,"correct":22},"从关注底层功能需求变更的角度",{"key":27,"text":125,"correct":32},"按照从高层到底层的顺序",{"key":30,"text":127,"correct":22},"按照从底层到高层的顺序",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},388669,"WBS最底层的工作单元被称为工作包，以下关于工作包的叙述中，正确的是 （ ） 。",[132,134,136,138],{"key":20,"text":133,"correct":32},"可依据工作包来确定进度安排、成本估算等工作",{"key":24,"text":135,"correct":22},"工作包可以非常具体，也可以很粗略，视项目情况而定",{"key":27,"text":137,"correct":22},"如果项目规模很大，也可以将其分解为子项目，这时子项目可以认为是一个工作包",{"key":30,"text":139,"correct":22},"工作包的规模应该较小，可以在40小时之内完成",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":24,"analysis":33},388670,"关于WBS的描述，不正确的是：（ ） 。",[144,146,148,150],{"key":20,"text":145,"correct":22},"WBS 必须且只能包括100%的工作",{"key":24,"text":147,"correct":32},"WBS 的元素必须指定一个或多个负责人",{"key":27,"text":149,"correct":22},"WBS 应该由全体项目成员、用户和项目干系人一致确认",{"key":30,"text":151,"correct":22},"分包出去的工作也应纳入WBS中",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},388671,"项目范围基线包括 （ ） 。",[156,158,160,162],{"key":20,"text":157,"correct":32},"批准的项目范围说明书、WBS及WBS字典",{"key":24,"text":159,"correct":22},"项目初步范围说明书、WBS及WBS字典",{"key":27,"text":161,"correct":22},"批准的项目范围说明书，WBS字典",{"key":30,"text":163,"correct":22},"项目详细范围说明书、WBS",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":30,"analysis":33},388672,"某公司中标一个企业信息化系统开发项目，合同中该项目包括：人事系统、OA系统和生产系统。下图为项目经理制作的WBS，此处项目经理违反了关于WBS的 （ ） 原则。",[168,170,172,174],{"key":20,"text":169,"correct":22},"WBS需要考虑将不同的人员的工作分开",{"key":24,"text":171,"correct":22},"WBS中各项工作是为提供可交付成果服务的",{"key":27,"text":173,"correct":22},"可以按照系统子系统来逐层分解 WBS",{"key":30,"text":175,"correct":32},"一个工作单元只能从属于某个上层单元",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},388673,"以下关于需求跟踪的叙述中，不正确的是 （ ） 。",[180,182,184,186],{"key":20,"text":181,"correct":32},"需求跟踪是为了确认需求，并保证需求被实现",{"key":24,"text":183,"correct":22},"需求跟踪可以改善产品质量",{"key":27,"text":185,"correct":22},"需求跟踪可以降低维护成本",{"key":30,"text":187,"correct":22},"需求跟踪能力矩阵用于表示需求和别的系统元素之间的联系链",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":30,"analysis":33},388674,"（ ）不是软件需求分析的目的。",[192,194,196,198],{"key":20,"text":193,"correct":22},"检测和解决需求之间的冲突",{"key":24,"text":195,"correct":22},"发现软件的边界，以及软件与其环境如何交互",{"key":27,"text":197,"correct":22},"详细描述系统需求",{"key":30,"text":199,"correct":32},"导出软件需求",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},388675,"以下关于软件需求分析的叙述中，不正确的是（ ） 。",[204,206,208,210],{"key":20,"text":205,"correct":32},"软件需求分析阶段的任务是描述出软件架构及相关组件之间的接口",{"key":24,"text":207,"correct":22},"软件需求分析可以检测和解决需求之间的冲突",{"key":27,"text":209,"correct":22},"软件需求分析可以确定系统的边界",{"key":30,"text":211,"correct":22},"软件需求分析是软件工程中的一个关键过程",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":30,"analysis":33},388676,"对项目的投资效果进行经济评价的方法主要有静态分析法和动态分析法。以下叙述中，不正确的是 （ ） 。",[216,218,220,222],{"key":20,"text":217,"correct":22},"静态分析法对若干方案进行粗略评价，或对短期投资项目做经济分析时，不考虑资金的时间价值",{"key":24,"text":219,"correct":22},"动态分析法考虑资金的时间价值",{"key":27,"text":221,"correct":22},"静态分析法包括投资收益率法、投资回收期法、追加投资回收期法",{"key":30,"text":223,"correct":32},"动态分析法包括挣现值法、内部收益率法、最小费用法",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},388677,"以下关于工程项目范围确认与质量控制的表述中，正确的是 （ ）",[228,230,232,234],{"key":20,"text":229,"correct":32},"范围确认是有关工作结果的可接受问题，质量控制是有关工作结果是否满足质量需求的问题",{"key":24,"text":231,"correct":22},"范围确认与质量控制相同",{"key":27,"text":233,"correct":22},"质量控制通常是在范围确认之前进行，这两个过程是串行执行的",{"key":30,"text":235,"correct":22},"范围确认的输入包含项目分解结构字典，质量控制输入不包含项目分解结构字典",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},388678,"_____是客户等项目干系人正式验收并接受已完成的项目可交付物的过程",[240,242,244,246],{"key":20,"text":241,"correct":32},"范围确认",{"key":24,"text":243,"correct":22},"范围控制",{"key":27,"text":245,"correct":22},"范围基准",{"key":30,"text":247,"correct":22},"里程碑清单",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},388679,"一般而言，项目的范围确定后，项目的三个基本目标是 （ ） 。",[252,254,256,258],{"key":20,"text":253,"correct":32},"时间、成本、质量标准",{"key":24,"text":255,"correct":22},"时间、功能、成本",{"key":27,"text":257,"correct":22},"成本、功能、质量标准",{"key":30,"text":259,"correct":22},"时间、功能、质量标准",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":27,"analysis":33},388681,"范围管理计划中一般不会描述 ：",[264,266,268,270],{"key":20,"text":265,"correct":22},"如何定义项目范围",{"key":24,"text":267,"correct":22},"制定详细的范围说明书",{"key":27,"text":269,"correct":32},"需求说明书的编制方法和要求",{"key":30,"text":271,"correct":22},"确认和控制范围",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":30,"analysis":33},388682,"某软件开发项目在项目的最后阶段发现对某个需求的理解与客户不一致，产生该问题最可能的原因是 （ ） 工作不完善。",[276,278,280,282],{"key":20,"text":277,"correct":22},"需求获取",{"key":24,"text":279,"correct":22},"需求分析",{"key":27,"text":281,"correct":22},"需求定义",{"key":30,"text":283,"correct":32},"需求验证",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},388683,"（ ） 描述了项目范围的形成过程。",[288,290,292,294],{"key":20,"text":289,"correct":32},"它在项目的早期被描述出来并随着项目的进展而更加详细",{"key":24,"text":291,"correct":22},"它是在项目章程中被定义并且随着项目的进展进行必要的变更",{"key":27,"text":293,"correct":22},"在项目早期，项目范围包含某些特定的功能和其他功能，并且随着项目的进展添加更详细的特征",{"key":30,"text":295,"correct":22},"它是在项目的早期被描述出来并随着范围的蔓延而更加详细",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":20,"analysis":33},388684,"下面属于项目范围控制活动的是 （ ） 。",[300,302,304,306],{"key":20,"text":301,"correct":32},"对项目的绩效情况进行分析，确定是否偏离设定的范围基准",{"key":24,"text":303,"correct":22},"对详细的范围说明书进行评审，提交客户签字确认",{"key":27,"text":305,"correct":22},"与客户充分沟通以获取项目的详细需求",{"key":30,"text":307,"correct":22},"与客户开展审查或检查活动，判断工作和交付成果是否符合设定的标准",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":30,"analysis":33},388685,"某项目经理在定义项目范围时绘制了如下所示的WBS。根据该图，下列说法中， （ ） 是不正确的。",[312,314,316,318],{"key":20,"text":313,"correct":22},"可重新设计该图，将项目生命周期阶段作为第一层",{"key":24,"text":315,"correct":22},"可重新设计该图，按照组织结构形式进行工作分解",{"key":27,"text":317,"correct":22},"可重新设计该图，以列表形式展示",{"key":30,"text":319,"correct":32},"可重新设计该图，将外包出去的模块从图中去除以达到精简目的",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":27,"analysis":33},388686,"关于项目范围的陈述，正确的是______ 。",[324,325,327,329],{"key":20,"text":293,"correct":22},{"key":24,"text":326,"correct":22},"项目范围在项目章程中被定义并且随着项目的进展进行必要的变更",{"key":27,"text":328,"correct":32},"项目范围在项目的早期被描述出来并随着项目的进展而更加详细",{"key":30,"text":330,"correct":22},"项目范围在项目的早期被描述出来并随着范围的蔓延而更加详细",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},388688,"大型项目可能包括一些超出单个项目范围的工作。项目范围是否完成以在 （53） 中规定的任务是否完成作为衡量标志。①项目管理计划 ②项目范围说明书 ③WBS ④产品验收标准 ⑤更新的项目文档 ⑥WBS字典",[335,337,338,340],{"key":20,"text":336,"correct":22},"①②③④",{"key":24,"text":57,"correct":32},{"key":27,"text":339,"correct":22},"①③④⑤",{"key":30,"text":341,"correct":22},"②④⑤⑥",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},388689,"确定信息系统集成项目的需求是项目成功实施的保证，项目需求确定属于（）的内容",[346,348,349,351],{"key":20,"text":347,"correct":22},"初步可行性的研究",{"key":24,"text":43,"correct":32},{"key":27,"text":350,"correct":22},"项目范围基准",{"key":30,"text":352,"correct":22},"详细可行性的研究",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":27,"analysis":33},388690,"项目范围变更控制，包括 （ ） 。",[357,359,361,363],{"key":20,"text":358,"correct":22},"一系列正规的证明文件，用于定义正规项目文件的变更步骤",{"key":24,"text":360,"correct":22},"一系列文档程序，用于实施技术和管理的指导和监督，以确定和记录项目条款的功能和物理特征、记录和报告变更、控制变更、审核条款和系统，由此来检验其与要求的一致性",{"key":27,"text":362,"correct":32},"审批项目范围变更的一系列过程，包括书面文件、跟踪系统和授权变更所必须的批准级别",{"key":30,"text":364,"correct":22},"用于项目需求获取的一些措施，如果没有执行这些措施就不能被变更",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":30,"analysis":33},388691,"下列关于工作分解结构（WBS）的叙述中，错误的是：",[369,371,373,375],{"key":20,"text":370,"correct":22},"项目经理在分解结构时，严格地将一个工作单元隶属于某个上层工作单元，完全避免交叉从属",{"key":24,"text":372,"correct":22},"项目管理部依照项目经理分解的WBS进行项目成本估算，但最后发现成本超过预计投资",{"key":27,"text":374,"correct":22},"项目经理将项目管理工作也编制成为WBS的一部分",{"key":30,"text":376,"correct":32},"项目经理在执行某复杂项目时，在项目开始阶段一次性将项目分解成为精确的WBS，最后按计划完成了任务，受到领导好评",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":30,"analysis":33},388692,"范围控制的目的是监控项目的状态，如“项目的工作范围状态和产品范围状态”，范围控制不涉及 （ ） 。",[381,383,385,387],{"key":20,"text":382,"correct":22},"影响导致范围变更的因素",{"key":24,"text":384,"correct":22},"确保所有被请求的变更按照项目整体变更控制过程处理",{"key":27,"text":386,"correct":22},"范围变更发生时管理实际的变更",{"key":30,"text":388,"correct":32},"确定范围变更是否已经发生",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":27,"analysis":33},388693,"以下关于工作分解结构的叙述，错误的是 （ ） 。",[393,395,397,399],{"key":20,"text":394,"correct":22},"工作分解结构是项目各项计划和控制措施制订的基础和主要依据",{"key":24,"text":396,"correct":22},"工作分解结构是面向可交付物的层次型结构",{"key":27,"text":398,"correct":32},"工作分解结构可以不包括分包出去的工作",{"key":30,"text":400,"correct":22},"工作分解结构能明确项目相关各方面的工作界面，便于责任划分和落实",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":30,"analysis":33},388694,"（ ） 不属于制订WBS过程的功能。",[405,407,409,411],{"key":20,"text":406,"correct":22},"为提高项目成本、活动历时估算和资源估算的准确度建立基础",{"key":24,"text":408,"correct":22},"定义绩效考核和控制的基准",{"key":27,"text":410,"correct":22},"形成清晰的职责任命",{"key":30,"text":412,"correct":32},"建立项目经理和项目干系人之间的沟通网络",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":30,"analysis":33},388695,"在某信息化项目建设过程中，客户对于最终的交付物不认可，给出的原因是系统信号强度超过用户设备能接受的上限。请问在项目执行过程中，如果客户对于项目文件中的验收标准有异议，而项目内所有工作流程均无问题，则可能是 _____ 环节出了问题。",[417,419,421,423],{"key":20,"text":418,"correct":22},"质量控制",{"key":24,"text":420,"correct":22},"WBS分解过程",{"key":27,"text":422,"correct":22},"变更控制",{"key":30,"text":241,"correct":32},{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},388696,"某项目经理在定义项目范围时绘制了如下所示的WBS。根据该图，下列说法中， （ ）是正确的 。",[428,430,432,434],{"key":20,"text":429,"correct":32},"图中第一层的内容有误，子项目和可交付物不能置于同一层",{"key":24,"text":431,"correct":22},"图中的第2、4.5层都有工作包，违反了WBS的分解原则",{"key":27,"text":433,"correct":22},"图中展示的是一个分解方式合理的WBS",{"key":30,"text":435,"correct":22},"图中的工作包是WBS中较大的单元，可向下继续分解",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},388697,"下面关于WBS的描述，错误的是：",[440,442,444,446],{"key":20,"text":441,"correct":22},"WBS是管理项目范围的基础，详细描述了项目所要完成的工作",{"key":24,"text":443,"correct":32},"WBS最底层的工作单元称为功能模块",{"key":27,"text":445,"correct":22},"树型结构图的WBS层次清晰、直观、结构性强",{"key":30,"text":447,"correct":22},"比较大的、复杂的项目一般采用列表形式的WBS表示",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":30,"analysis":33},388698,"不能作为检验WBS是否定义完全，项目的所有任务是否都被完全分解的依据是 （ ）",[452,454,456,458],{"key":20,"text":453,"correct":22},"是否明确定义了每个任务的开始和结束",{"key":24,"text":455,"correct":22},"是否每个任务都有一个可交付的成果",{"key":27,"text":457,"correct":22},"是否容易估算成本",{"key":30,"text":459,"correct":32},"是否明确了变更申请",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":27,"analysis":33},388699,"通常把被批准的详细的项目范围说明书和与之相关的_____作为项目的范围基准，并在整个项目的生命期内对之进行监控、核实和确认",[464,466,468,470],{"key":20,"text":465,"correct":22},"产品需求",{"key":24,"text":467,"correct":22},"项目管理计划",{"key":27,"text":469,"correct":32},"WBS以及WBS字典",{"key":30,"text":471,"correct":22},"合同",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":27,"analysis":33},388700,"一个项目经理被分配到一个高优先度的新项目。只有5个可用的资源，因为其他资源已经被承诺给别的项目，完成项目的资源可用时间不足所需时间的一半，并且这个项目经理不能说服管理层改变项目的结束日期。此时，项目经理应 （ ） 。",[476,478,480,482],{"key":20,"text":477,"correct":22},"协调团队成员安排必要的加班，以便完成工作",{"key":24,"text":479,"correct":22},"给团队提供良好的工作环境",{"key":27,"text":481,"correct":32},"通过删除在限定时间内不能完成的工作来削减工作范围",{"key":30,"text":483,"correct":22},"使用更有经验的资源，更快地完成工作",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":27,"analysis":33},388701,"下面关于项目范围确认描述， （） 是正确的。",[488,490,492,494],{"key":20,"text":489,"correct":22},"范围确认是一项对项目范围说明书进行评审的活动",{"key":24,"text":491,"correct":22},"范围确认活动通常由项目组和质量管理员参与执行即可",{"key":27,"text":493,"correct":32},"范围确认过程中可能会产生变更申请",{"key":30,"text":495,"correct":22},"范围确认属于一项质量控制活动",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":24,"analysis":33},388702,"确定信息系统集成项目的需求是项目成功实施的保证，项目需求确定属于 （ ） 。",[500,501,502,503],{"key":20,"text":347,"correct":22},{"key":24,"text":43,"correct":32},{"key":27,"text":350,"correct":22},{"key":30,"text":504,"correct":22},"项目可行性的研究",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":27,"analysis":33},388703,"项目范围的定义和管理过程将影响到整个项目是否成功。每个项目都必须慎重地权衡工具、数据来源、方法论、过程和程序以及其他一些因素，以确保在管理项目范围时所做的努力与项目的规模、复杂性和重要性相符。因此，项目经理应该重点关注 （ ） 这个过程。",[509,510,512,514],{"key":20,"text":243,"correct":22},{"key":24,"text":511,"correct":22},"范围变更",{"key":27,"text":513,"correct":32},"编制范围管理计划",{"key":30,"text":241,"correct":22},{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":30,"analysis":33},388704,"（ ）是用来显示分配给每个工作包的项目资源的表格。",[519,521,523,525],{"key":20,"text":520,"correct":22},"WBS",{"key":24,"text":522,"correct":22},"OBS",{"key":27,"text":524,"correct":22},"RBS",{"key":30,"text":526,"correct":32},"RAM",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":20,"analysis":33},388705,"某项目经理在公司负责管理一个产品开发项目。开始时，产品被定义为“最先进的个人运输工具”，后来被描述为“不需要汽油的先进个人运输工具”。最后，与设计工程师进行了整夜的讨论后，被描述为“成本在15000美元以下，不需要汽油、不产生噪声的最先进的个人运输工具”。这表明产品的特征正在不断地改进，不断地调整，但是应注意将其与（ ）协调一致。",[531,533,535,537],{"key":20,"text":532,"correct":32},"范围定义",{"key":24,"text":534,"correct":22},"项目干系人利益",{"key":27,"text":536,"correct":22},"范围变更控制系统",{"key":30,"text":538,"correct":22},"客户的战略计划",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":30,"analysis":33},388706,"（ ）是指可以组织一些群体活动来识别项目和产品需求，包括头脑风暴法、名义小组技术、德尔菲技术、概念\u002F思维导图、亲和图和多标准决策分析等。",[543,545,547,549],{"key":20,"text":544,"correct":22},"焦点小组",{"key":24,"text":546,"correct":22},"引导式会议",{"key":27,"text":548,"correct":22},"问卷调查",{"key":30,"text":550,"correct":32},"群体创新技术",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},388707,"在需求跟踪过程中，检査设计文档、代码、测试用例等工作成果是否都能在《产品需求规格说明书》中找到出处的方法属于（ ） 。",[555,557,559,561],{"key":20,"text":556,"correct":32},"逆向跟踪",{"key":24,"text":558,"correct":22},"正向跟踪",{"key":27,"text":560,"correct":22},"双向跟踪",{"key":30,"text":562,"correct":22},"系统跟踪",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":27,"analysis":33},388708,"按照下图所示的项目工作分解结构，其中空白处的内容应为 （ ） 。",[567,569,571,573],{"key":20,"text":568,"correct":22},"需求开发，系统测试",{"key":24,"text":570,"correct":22},"需求开发，系统交付",{"key":27,"text":572,"correct":32},"需求确认，系统测试",{"key":30,"text":574,"correct":22},"需求确认，系统交付",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":20,"analysis":33},388709,"表示需求和别的系统元素之间的联系链的最普遍方式是使用需求跟踪能力矩阵。如果软件开发人员发现，有一个孤立的设计元素在需求跟踪能力矩阵中不能回溯到需求，但其表明一个正当的功能，则说明 （ ） 。",[579,581,583,585],{"key":20,"text":580,"correct":32},"需求规格说明书漏掉了一项需求",{"key":24,"text":582,"correct":22},"设计元素不满足用户需求",{"key":27,"text":584,"correct":22},"需求规格不满足用户需求",{"key":30,"text":586,"correct":22},"在需求跟踪能力矩阵中不需要建立用户需求与设计元素之间的联系",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":27,"analysis":33},388710,"以下关于项目范围和产品范围的叙述中，不正确的是：（ ）。",[591,593,595,597],{"key":20,"text":592,"correct":22},"项目范围是为了获得具有规定特性和功能的产品、服务和结果，而必须完成的项目工作",{"key":24,"text":594,"correct":22},"产品范围是表示产品、服务和结果的特性和功能",{"key":27,"text":596,"correct":32},"项目范围是否完成以产品要求作为衡量标准",{"key":30,"text":598,"correct":22},"项目的目标是项目范围管理计划编制的一个基本依据",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":30,"analysis":33},388711,"在软件项目中， （ ） 是确保需求不在开发过程中“丢失”的一个有效措施。",[603,605,607,609],{"key":20,"text":604,"correct":22},"做好需求变更管理",{"key":24,"text":606,"correct":22},"做好需求确认",{"key":27,"text":608,"correct":22},"做好需求回溯",{"key":30,"text":610,"correct":32},"做好需求追溯",[612,616,619,622,625,628],{"id":613,"name":614,"category":7,"favorite":615},136,"法律职业试卷二(客观题 )",2,{"id":617,"name":618,"category":7,"favorite":15},137,"法律职业试卷一(客观题 )",{"id":620,"name":621,"category":7,"favorite":15},176,"（初级）社会工作实务",{"id":623,"name":624,"category":7,"favorite":15},177,"（初级）社会综合能力",{"id":626,"name":627,"category":7,"favorite":8},28,"安全工程师",{"id":629,"name":630,"category":7,"favorite":8},112,"安全生产法律知识"]