[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-390050":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},390050,172,1,"单选题","对项目目标存在消极影响的风险或威胁，下列说法不正确的是（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","延长进度或减少范围采取的是回避措施",false,{"key":16,"text":17,"correct":14},"B","履约保证书采取的是转移措施",{"key":19,"text":20,"correct":14},"C","设计时在子系统中设置冗余组件减轻组件故障所造成的影响是减轻措施",{"key":22,"text":23,"correct":24},"D","以上都不正确",true,"",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]