[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-390025":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},390025,172,1,"单选题","在项目风险分析过程中，灵敏度分析、建模和仿真通常用于 （ ） 。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","定性风险分析",false,{"key":16,"text":17,"correct":18},"B","定量风险分析",true,{"key":20,"text":21,"correct":14},"C","总体风险分析",{"key":23,"text":24,"correct":14},"D","具体风险分析","灵敏度分析、建模和仿真是属于定量风险分析中的工具。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]