[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389908":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},389908,172,1,"单选题","企业系统规划（Business System，BSP）办法包含一定的步骤，完成准备工作后，需要进行的四个步骤依次是： （ ） 。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","定义企业过程，识别定义数据类，确定管理部门对系统的要求，分析现有系统",false,{"key":16,"text":17,"correct":14},"B","识别定义数据类，定义企业过程，确定管理部门对系统的要求，分析现有系统",{"key":19,"text":20,"correct":21},"C","定义企业过程，识别定义数据类，分析现有系统，确定管理部门对系统的要求",true,{"key":23,"text":24,"correct":14},"D","识别定义数据类，定义企业过程，分析现有系统，确定管理部门对系统的要求","企业系统规划的步骤如下图所示：",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]