[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389837":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},389837,172,1,"单选题","（）is one of the quality planning outputs.",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","Scope base line",false,{"key":16,"text":17,"correct":14},"B","Cost of quality",{"key":19,"text":20,"correct":14},"C","Product specification",{"key":22,"text":23,"correct":24},"D","Quality checklist",true,"是制定项目质量管理计划过程的成果之一。 A．范围基线 B．质量成本 C．产品规范 D．质量检查表",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]