[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389824":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},389824,172,1,"单选题","An example of scope verification is （ ）. A.review the performance of an installed software module",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","managing changes to the project schedule",true,{"key":16,"text":17,"correct":18},"B","decomposing the WBS to a work package level",false,{"key":20,"text":21,"correct":18},"C","performing a benefit\u002Fcost analysis to determine if we should procee",{"key":23,"text":24,"correct":18},"D","with the project","范围验证的一个示例是查看已安装的软件模块的性能。A．查看已安装的软件模块的性能 B．项目进度变更管理 C．分解到工作包级别WBS D．执行成本／效益分析，以确定是否我们应该继续进行项目",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]