[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389755":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},389755,172,1,"单选题","某企业计划研发甲、乙、丙、丁四种产品。每种产品必须依次由设计部门、制造部门和检验部门进行设计、制造和检验，而每个部门必须按同样的顺序处理这几种产品。各种产品各项工作所需的时间如下表。 只要适当安排好产品研究顺序，企业最快可以在 （ ） 天全部完成这四种产品的研发。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","84",true,{"key":16,"text":17,"correct":18},"B","86",false,{"key":20,"text":21,"correct":18},"C","91",{"key":23,"text":24,"correct":18},"D","93","",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]