[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389701":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},389701,172,1,"单选题","评估和选择最佳系统设计方案时，甲认为可以采用点值评估方法，即根据每一个价值因素的重要性，综合打分在选择最佳的方案。乙根据甲的提议，对系统 A 和系统 B 进行评估，评估结果如下表所示，那么乙认为 （ ） 。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","最佳方案是A",false,{"key":16,"text":17,"correct":14},"B","最佳方案是B",{"key":19,"text":20,"correct":21},"C","条件不足，不能得出结论",true,{"key":23,"text":24,"correct":14},"D","只能用成本\u002F效益分析方法做出判断","采用加权系统进行分析。 A，B计算后的评估值均为84。 A=90×40%+80×40%+80×20%=84，B=80×40%+85×40%+90×20%=84",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]