[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389687":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},389687,172,1,"单选题","某水库现在的水位已超过安全线，上游河水还在匀速流入。为了防洪，可以利用其10个泄洪闸（每个闸的泄洪速度相同）来调节泄洪速度。经测算，若打开1个泄洪闸，再过10个小时就能将水位降到安全线；若同时打开2个泄洪闸，再过4个小时就能将水位降到安全线。现在抗洪指挥部要求再过1个小时就必须将水位降到安全线；为此，应立即打开（ ）个泄洪闸。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","6",false,{"key":16,"text":17,"correct":18},"B","7",true,{"key":20,"text":21,"correct":14},"C","8",{"key":23,"text":24,"correct":14},"D","9","设注入速为x，泄洪速为y，安全线假设为1，同时开设为z，则有： 10×x-10×y=1（1） 4×x-4×y×2=1（2）1×x-1×y×z=1（3）求z，由（1）-（2），（2）-（3）得： 6×x=2×y 3×x=（8-z）×y求得z=7。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]