[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389621":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},389621,172,1,"单选题","针对以下情况 （ ） ，能够依据《大楼通信布线系统》D\u002FT926进行综合布线",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","大楼跨越距离2500米，建筑总面积80万平方米，区域人员20万人",false,{"key":16,"text":17,"correct":14},"B","大楼跨越距离3500米，建筑总面积80万平方米，区域人员20万人",{"key":19,"text":20,"correct":14},"C","大楼跨越距离1500米，建筑总面积60万平方米，区域人员60万人",{"key":22,"text":23,"correct":24},"D","大楼跨越距离2500米，建筑总面积40万平方米，区域人员4万人",true,"我国颁布的通信行业标准《大楼通信综合布线系统》D／T926的适用范围是跨越距离不超过 3000米、建筑总面积不超过100万平方米的布线区域，区域内的人员为50人至5万人。所以，本题的正确选项是D。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]