[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389431":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},389431,172,1,"单选题","当出现招标文件中的某项规定与招标人对投标人质疑问题的书面解答不一致时，应以（ ） 为准。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","招标文件中的规定",false,{"key":16,"text":17,"correct":14},"B","现场考察时招标单位的口头解释",{"key":19,"text":20,"correct":14},"C","招标单位在会议上的口头解答",{"key":22,"text":23,"correct":24},"D","对招标人质疑的书面解答问题",true,"当出现招标文件中的某项规定与招标人对投标人质疑问题的书面解答不一致时，应以对招标人质疑的书面回复为准。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]