[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389392":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},389392,172,1,"单选题","项目选择和项目优先级排序是项目组合管理的重要内容，其中 （ ） 不属于结构化的项目选择和优先级排序的方法。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","DIPP分析",false,{"key":16,"text":17,"correct":18},"B","期望货币值",true,{"key":20,"text":21,"correct":14},"C","财务分析",{"key":23,"text":24,"correct":14},"D","决策表技术","结构化的项目选择和优先级排列方法包括：决策表技术、财务分析和DIFF分析。DIPP＝EMV（截至目前的时间为止）\u002F ETC（估算到完成时的成本）EMV：指项目的期望货币值，如果考虑支付风险因素，则期望货币值是各个支付值与支付概率的乘积之和。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]