[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389387":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},389387,172,1,"单选题","以下关于大型复杂项目和多项目管理的叙述中，不正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","大型复杂项目必须建立以过程为基础的管理体系",false,{"key":16,"text":17,"correct":18},"B","为了确保大型复杂项目的过程制度起到预期作用，必须在项目团队内部建立统一的体系，包括制定过程、计划过程、执行过程",true,{"key":20,"text":21,"correct":14},"C","大型复杂项目的项目过程确定后，再制定项目计划",{"key":23,"text":24,"correct":14},"D","大型IT项目大都是在需求不十分清晰的情况下开始的，所以项目自然分成需求定义和需求实现两个主要阶段","",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]