[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389380":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},389380,172,1,"单选题","大型复杂项目中，统一的项目过程体系可以保证项目质量。在统一过程体系中，（ ）相对更重要，以使过程制度达到期望的效果。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","制定过程",false,{"key":16,"text":17,"correct":14},"B","执行过程",{"key":19,"text":20,"correct":21},"C","监督过程",true,{"key":23,"text":24,"correct":14},"D","改进过程","",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]