[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389362":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},389362,172,1,"单选题","（ ） 不属于大型项目控制的三要素。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目绩效跟踪",false,{"key":16,"text":17,"correct":18},"B","质量改进",true,{"key":20,"text":21,"correct":14},"C","外部变更请求",{"key":23,"text":24,"correct":14},"D","变更控制","大型项目的控制过程有三个重要的因素：项目绩效跟踪、外部变更请求、变更控制。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]