[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389361":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},389361,172,1,"单选题","关于项目组合和项目集说法不正确的是（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目组合是由项目、项目集或子项目组合构成， 且组成部分需定期调整。",false,{"key":16,"text":17,"correct":14},"B","项目集是由项目或子项目集构成；其组成部分基 本稳定，可做必要调整",{"key":19,"text":20,"correct":14},"C","项目组合中各项目有优先级排序。",{"key":22,"text":23,"correct":24},"D","它们都没有明确的结束时间",true,"项目组合通常没有明确的结束时间，项目集可能有或没有明确的结束时间。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]