[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389356":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},389356,172,1,"单选题","以下关于大型IT项目的叙述中， （ ） 是不正确的。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","大型IT项目一般是在需求不十分清晰的情况下开始的，所以通常分解为需求定义和需求实现两个阶段",false,{"key":16,"text":17,"correct":14},"B","对大型项目进行需求定义时，往往要求对业务领域有深刻的理解",{"key":19,"text":20,"correct":14},"C","对大型项目进行需求实现时，往往要求对技术领域的精通",{"key":22,"text":23,"correct":24},"D","大型IT项目的需求定义和需求实现同通常都是由专业的咨询公司完成的",true,"本题考查的是大项目需求定义、实现的知识，需要掌握。需求实现一般是由系统集成公司来完成，D太绝对。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]