[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389329":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},389329,172,1,"单选题","一般某个项目的计划主要关注的是项目 （ ） 的计划。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","活动",true,{"key":16,"text":17,"correct":18},"B","过程",false,{"key":20,"text":21,"correct":18},"C","进度",{"key":23,"text":24,"correct":18},"D","范围","一般项目的计划主要关注的是项目活动的计划。但是对大型及复杂项目来说，制订活动计划前，必须首先考虑项目的过程计划，也就是必须先确定用什么方法和过程来完成项目。需不需要为一个项目单独建立一整套过程体系，需要由过程本身的作用和项目本身的需求和特征来决定。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]