[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389327":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},389327,172,1,"单选题","当一个大型及复杂项目在 （ ） 确定后，就需要制订项目计划。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","需求定义",false,{"key":16,"text":17,"correct":14},"B","活动计划",{"key":19,"text":20,"correct":21},"C","项目过程",true,{"key":23,"text":24,"correct":14},"D","项目团队","对大型及复杂项目来说，制订活动计划之前，必须先考虑项目的过程计划，也就是必须先确定什么方法和过程来完成项目。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]