[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389258":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},389258,172,1,"单选题","某电子政务信息化建设项目的项目经理得知一项新的政府管理方面的要求将会引起该项目范围的变更，为此，项目经理应该首先 （ ） 。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","召集一次变更控制委员会会议",false,{"key":16,"text":17,"correct":14},"B","改变工作分解包，项目时间表和项目计划以反映该管理要求",{"key":19,"text":20,"correct":21},"C","准备变更请求",true,{"key":23,"text":24,"correct":14},"D","制订新的项目计划并通知项目干系人","题干中“新的政府管理方面的要求将会引起该项目范围的变更”属于强制变更，为此项目经理应首先说明变更的原因及其影响并“准备变更请求”。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]