[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389181":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},389181,172,1,"单选题","在以下基于配置库的变更控制的图示中，①应为（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","读写",false,{"key":16,"text":17,"correct":14},"B","删除",{"key":19,"text":20,"correct":14},"C","变更",{"key":22,"text":23,"correct":24},"D","复制",true,"根据教材P500，图中①为复制。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]