[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389120":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},389120,172,1,"单选题","项目人力资源计划编制完成以后，不能得到的是 （ ） 。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","角色和职责的分配",false,{"key":16,"text":17,"correct":14},"B","项目的组织结构图",{"key":19,"text":20,"correct":14},"C","人员配置管理计划",{"key":22,"text":23,"correct":24},"D","项目团队成员的人际关系",true,"本题考查人力资源计划的内容。《系统集成项目管理工程师教程》的",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]