[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389108":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},389108,172,1,"单选题","某公司任命小王为某信息系统开发项目的项目经理。小王组建的团队经过一段时间的磨合，成员之间项目熟悉和了解。矛盾基本解决，项目经理能够得到团队的认可。由于项目进度落后，小王又向公司提出申请，项目组加入了2名新成员。此时项目团队处于（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","震荡阶段",false,{"key":16,"text":17,"correct":14},"B","发挥阶段",{"key":19,"text":20,"correct":21},"C","形成阶段",true,{"key":23,"text":24,"correct":14},"D","规范阶段","曾经考过，团队增加新人后，从形成阶段重新走这个过程。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]