[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-389014":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},389014,172,1,"单选题","（ ） 属于项目财务绩效评估的基本方法。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","动态分析法",true,{"key":16,"text":17,"correct":18},"B","预期效益分析法",false,{"key":20,"text":21,"correct":18},"C","风险调整贴现率法",{"key":23,"text":24,"correct":18},"D","因果图","项目财务绩效评估的基本方法有静态分析法和动态分析法。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]