[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388980":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},388980,172,1,"单选题","下表为一个即将投产项目的计划收益表，经计算，该项目的投资回收期是 （ ） 。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","4.30",false,{"key":16,"text":17,"correct":18},"B","5.73",true,{"key":20,"text":21,"correct":14},"C","4.73",{"key":23,"text":24,"correct":14},"D","5.30","由静态投资回收期（Pt）计算公式可知，Pt=[累计净现金流量开始出现正值的年份数]-1+[上年累计净现金流量的绝对值\u002F当年净现金流量]将本题中的数据代入公式，可得：Pt=6-1+26\u002F35.5=5.73故B是正确答案。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]