[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388963":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},388963,172,1,"单选题","对项目的投资效果进行经济评价的方法，包含静态分析法合动态分析法，这两种方法的区别主要体现在（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","是否考虑了资金的时间价值",true,{"key":16,"text":17,"correct":18},"B","是否考虑了投资效益",false,{"key":20,"text":21,"correct":18},"C","是否考虑了投资回收期",{"key":23,"text":24,"correct":18},"D","是否考虑了投资总额和差额","",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]