[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388897":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},388897,172,1,"单选题","某公司有50个正在进行的项目，张工是该公司的一个大项目经理，领导6个项目经理负责大项目或多项目的管理，每个项目级理至少负责两个项目，张工必须为每个项目合理安排进度和分配资源，则 （ ） 对张工至关重要。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","资源的使用和资源的评估",false,{"key":16,"text":17,"correct":18},"B","活动清单和WBS",true,{"key":20,"text":21,"correct":14},"C","时间的压缩和模拟",{"key":23,"text":24,"correct":14},"D","进度的滑移和待处理工作的数量","活动清单和WBS是进行资源估算的基础。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]