[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388866":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},388866,172,1,"单选题","某监理单位承担了一个信息系统工程全过程的监理 工作在应用系统建设过程中，由于工期紧张，成本有限，监理工程师按照承建单位的进度计划严格进行跟踪检查，并要求承建单位对 A、 B、 C、D四个重要活动进行成本优化。监理工程师在检查承建单位项目经理的成本优化方案时，检查了如下网络图: 项目的总工期（）周",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","17",false,{"key":16,"text":17,"correct":18},"B","18",true,{"key":20,"text":21,"correct":14},"C","19",{"key":23,"text":24,"correct":14},"D","20","结合案例，如果按照正常工期估计，写出项目关键路径，并计算项目工期和项目总成本。项目总工期：10+8 =18 周",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]