[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388853":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},388853,172,1,"单选题","公式 （ ） 能最准确地计算项目活动的工作量。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工作量 = 历时\u002F人员生产率",false,{"key":16,"text":17,"correct":14},"B","工作量 = 历时\u002F人力资源数量",{"key":19,"text":20,"correct":14},"C","工作量 =（最乐观时间+4最可能时间+最悲观时间）\u002F 6",{"key":22,"text":23,"correct":24},"D","工作量 = 项目规模\u002F人员生产率",true,"",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]