[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388714":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},388714,172,1,"单选题","下列关于需求变更影响分析的做法中， （ ） 是错误的。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","需求主管人员把需求变更的优先级分为5级",false,{"key":16,"text":17,"correct":14},"B","建立一个需求决策数据库，根据数据库内容知道变更决策",{"key":19,"text":20,"correct":21},"C","没有代价或不影响进度的变更可以直接实施",true,{"key":23,"text":24,"correct":14},"D","变更分析流程需考虑：涉及问题核对，影响软件元素核对，评估变更工时、评估工作值总和、任务顺序、变更对路径的影响，对进度成本的影响、优先级等","没有代价或不影响进度的变更并不可以直接实施，仍需要按照相关规范流程处理。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]