[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388676":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},388676,172,1,"单选题","对项目的投资效果进行经济评价的方法主要有静态分析法和动态分析法。以下叙述中，不正确的是 （ ） 。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","静态分析法对若干方案进行粗略评价，或对短期投资项目做经济分析时，不考虑资金的时间价值",false,{"key":16,"text":17,"correct":14},"B","动态分析法考虑资金的时间价值",{"key":19,"text":20,"correct":14},"C","静态分析法包括投资收益率法、投资回收期法、追加投资回收期法",{"key":22,"text":23,"correct":24},"D","动态分析法包括挣现值法、内部收益率法、最小费用法",true,"最小费用法属于静态分析法。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]