[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388646":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},388646,172,1,"单选题","下面针对项目整体变更控制过程的叙述不正确的是 （ ） 。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","配置管理的相关活动贯穿整体变更控制始终",false,{"key":16,"text":17,"correct":18},"B","整体变更控制过程主要体现在确定项目交付成果阶段",true,{"key":20,"text":21,"correct":14},"C","整体变更控制过程贯穿于项目的始终",{"key":23,"text":24,"correct":14},"D","整体变更控制的结果可能引起项目范围、项目管理计划、项目交付成果的调整","项目整体变更控制过程贯穿整个项目始终，并且应用于项目的各个阶段。由于极少有项目能完全按照原来的项目安排计划运行，因而变更控制就必不可少。整体变更控制的结果可能引起项目范围、项目管理计划、项目交付成果的调整配置管理的相关活动贯穿整体变更控制始终。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]