[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388623":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},388623,172,1,"单选题","通常在 （ ） 任命项目经理比较合适。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","可研过程之前",false,{"key":16,"text":17,"correct":14},"B","签订合同之前",{"key":19,"text":20,"correct":14},"C","招投标之前",{"key":22,"text":23,"correct":24},"D","开始制订项目计划前",true,"整体管理阶段的任务是：制订项目章程--制订项目计划--指导和管理项目执行--监督和控制项目工作--整体变更控制--项目收尾。任命项目经理的工作是在制订项目章程的阶段进行的。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]