[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388589":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},388589,172,1,"单选题","公司的小张正在准备一份关于甲项目的标书。标书中一般不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","投标书、投标报价一览表、分项一览表",false,{"key":16,"text":17,"correct":14},"B","公司的营业执照副本复印件加盖公章及其他相关证件",{"key":19,"text":20,"correct":14},"C","公司相关的技术资料",{"key":22,"text":23,"correct":24},"D","甲项目需求合理性分析",true,"需求合理分析属于编制投标文件以前的工作。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]