[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388540":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},388540,172,1,"单选题","解决组织中多个项目之间的资源冲突问题，一般不宜采用的方法是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","制订资源计划时，每个项目预留尽量多的资源富余量",true,{"key":16,"text":17,"correct":18},"B","检查组织内部的资源使用情况，看是否有资源分配不合理的情况",false,{"key":20,"text":21,"correct":18},"C","制订资源在项目间分配的原则,重要的项目优先得到资源",{"key":23,"text":24,"correct":18},"D","将组织中的资源进行统一管理，避免资源浪费和过度使用","",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]