[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388493":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},388493,172,1,"单选题","关于配置管理计划的制订和审批，下面说法正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","配置管理计划应由配置管理人员制订，由项目经理审批",false,{"key":16,"text":17,"correct":14},"B","配置管理计划应由项目经理制订，由配置控制委员会审批",{"key":19,"text":20,"correct":14},"C","配置管理计划应由项目经理制订，由QA人员审批",{"key":22,"text":23,"correct":24},"D","配置管理计划应由配置管理人员制订，由配置控制委员会审批",true,"配置管理员制定《配置管理计划》，CCB审批。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]