[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388466":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},388466,172,1,"单选题","在招标段，项目小组的任务是（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","进行自制或购买决策",false,{"key":16,"text":17,"correct":18},"B","准备采购文件",true,{"key":20,"text":21,"correct":14},"C","规定进度表参数，包括交付日期",{"key":23,"text":24,"correct":14},"D","为招标制定有关规定和图表","这只是在招揽规划阶段需要进行的活动之一。招揽规划是为招揽准备相关文件。其它选项是在项目采购管理的其它阶段发生的",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]