[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388440":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},388440,172,1,"单选题","人们对风险事件都有一定的承受能力，当（ ）时，人们愿意承担的风险越大。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目活动投入的越多",false,{"key":16,"text":17,"correct":18},"B","项目的收益越大",true,{"key":20,"text":21,"correct":14},"C","个人、组织拥有的资源越少",{"key":23,"text":24,"correct":14},"D","组织中高级别管理人员相对较少","常识题，排除法，人们得到利益越大，愿意承担的风险越大",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]