[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388409":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},388409,172,1,"单选题","在以下那些领域的冲突代表了所有项目冲突50%以上的内容：（ ）",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目成员，成本目标和进度表",false,{"key":16,"text":17,"correct":14},"B","成本目标，行政程序和进度表",{"key":19,"text":20,"correct":21},"C","进度表，项目优先性和人力资源",true,{"key":23,"text":24,"correct":14},"D","项目成员，项目优先性和成本目标","虽然所有选项都包含了潜在的冲突，但是50%以上的冲突是有时间表，优先性和人力资源造成的",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]