[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388401":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},388401,172,1,"单选题","项目人力资源管理计划一般不包括（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目中的角色和职责",false,{"key":16,"text":17,"correct":18},"B","绩效报告",true,{"key":20,"text":21,"correct":14},"C","项目组织结构图",{"key":23,"text":24,"correct":14},"D","人员配备管理计划","排除法。做计划时，选项B还得不到呢。项目人力资源计划编制的输出1．项目人力资源计划（1）角色和职责的分配。（2）项目的组织结构图。（3）人员配备管理计划。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]