[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388400":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},388400,172,1,"单选题","项目团队建设活动的首要目的是提高团队绩效，而很多活动所产生的附属效应也能够提高团队绩效。以下活动中，（ ）就代表了这种情况。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建立一套以团队为基础的奖励与表彰系统",false,{"key":16,"text":17,"correct":18},"B","让非管理层的团队成员参与到项目计划制订过程中",true,{"key":20,"text":21,"correct":14},"C","确定团队绩效的目标，并审查达到这些目标的最佳方法",{"key":23,"text":24,"correct":14},"D","为所有团队成员安排一间大办公室进行集中工作","让非管理层的团队成员参与到项目计划制订过程中”会产生激励和信任作用，也加强了沟通，获取了团队成员的知识与经验。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]