[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388384":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},388384,172,1,"单选题","确定使用于项目的质量标准并决定如何满足这些标准是（ ）过程的主要功能。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","质量目标",false,{"key":16,"text":17,"correct":14},"B","质量保证",{"key":19,"text":20,"correct":14},"C","质量方针",{"key":22,"text":23,"correct":24},"D","质量计划",true,"制定项目质量计划（OP）是项目质量管理的一部分，致力于制定质量目标并规定必要的运行过程和相关资源以实现项目质量目标。项目质量目标是指项目质量管理方追求的目的。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]