[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388369":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},388369,172,1,"单选题","（ ）不属于成本管理过程",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","资源计划过程",false,{"key":16,"text":17,"correct":14},"B","成本估计过程",{"key":19,"text":20,"correct":14},"C","成本预算过程",{"key":22,"text":23,"correct":24},"D","合同评审过程",true,"合同评审过程是合同收尾的内容，属于采购管理，而不是成本管理。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]