[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388367":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},388367,172,1,"单选题","在（ ）情况下，可使用储备金。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","需要添加额外资金以弥补初始预算",false,{"key":16,"text":17,"correct":14},"B","当协商劳动合同时，潜在劳动力价格会发生波动",{"key":19,"text":20,"correct":21},"C","确定发生了预计的问题但没有估计完全",true,{"key":23,"text":24,"correct":14},"D","当客户要求项目高质量完成时","储备金是为“已知的未知事件”准备的。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]