[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388356":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},388356,172,1,"单选题","你受雇于一个政府机构来管理一具为期3年、预算达300万美元的项目。如果项目有变更需求，人就需要在每个财政年度的年底有更多的资金注入。你可以在你的项目中使用这些资金。你决定要建立一个成本变更控制系统，这样做的目的是（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","明确什么时候向项目添加应急资金",false,{"key":16,"text":17,"correct":18},"B","明确定义变更成本基线的程序",true,{"key":20,"text":21,"correct":14},"C","判断成本变动发生的原因",{"key":23,"text":24,"correct":14},"D","判断是否需要修改预算","成本变更控制系统包括文件、跟踪和年批准变更需要的批准级别。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]