[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388324":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},388324,172,1,"单选题","项目范围管理过程包括：范围计划、（ ）、范围定义、创建WBS、范围确认、范围控制6个主要过程。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","收集需求",true,{"key":16,"text":17,"correct":18},"B","范围定义",false,{"key":20,"text":21,"correct":18},"C","范围变更",{"key":23,"text":24,"correct":18},"D","编制范围说明书","对项目范围的管理，是通过5个管理过程来实现的。（1）编制范围管理计划；（2）收集需求（3）范围定义（4）创建工作分解结构（5）范围确认（6）范围控制",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]