[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388319":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},388319,172,1,"单选题","大型项目可能包括一些超出单个项目范围的工作。项目范围是否完成以在（ ）中规定的任务是否完成作为衡量标志。①项目管理计划②项目范围说明书③WBS④产品验收标准⑤更新的项目文档⑥WBS字典",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","①②③④",false,{"key":16,"text":17,"correct":18},"B","①②③⑥",true,{"key":20,"text":21,"correct":14},"C","①③④⑤",{"key":23,"text":24,"correct":14},"D","②④⑤⑥","大型项目可能包括一些超出单个项目范围的工作。项目范围是否完成以在项目管理计划、项目范围说明书、WBS和WBS字典中规定的任务是否完成作为衡量标志。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]