[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-388279":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},388279,172,1,"单选题","确定信息系统集成项目的需求是项目成功实施的保证，项目需求确定属于（ ）的内容。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","初步可行性研究",false,{"key":16,"text":17,"correct":14},"B","范围说明书",{"key":19,"text":20,"correct":14},"C","项目范围基准",{"key":22,"text":23,"correct":24},"D","详细可行性研究",true,"（2）详细可行性研究的内容。①概述。②需求确定。③现有资源、设施情况分析。④设计（初步）技术方法。⑤项目实施进度计划建议。⑥投资估算和资金筹措计划。⑦项目组织、人力资源、技术培训计划。⑧经济和社会效益分析（效果评价）。⑨合作，协作方式。",{"id":6,"name":27,"category":28,"favorite":29},"(高级)信息系统项目管理师","职业资格",0]